Laserfiche WebLink
r <br /> FIELD INVESTIGATION TEAM . <br /> CLASS II SITE HEALTH AND SAFETY PLANT <br /> Prior to initiating field activities, the Site Safety Officer..(SSO) must review the Site Health and Safety <br /> Plan (SHSP) with all members of the field crew. Each membez must then sign and date a copy of the <br /> SHSP indicating they have reviewed and understand all aspects of the SHSP This.signed copy is <br /> returned to the project file upon completion of field activities. ;. <br /> i <br /> SHSPs may be revised or rewritten for different phases of a project if site activities are distinctly <br /> different, if areas of differing hazard are involved, or as information about contaminants and hazards <br /> changes. Changing conditions may justify either tightening or loosening SHSP restrictions and action <br /> levels, depending upon the additional information generated i <br /> DELTA PROJECT NUMBER <br /> SIGNATURES OF REVIEWERS/FTELDCREW: Signature indicates that'the signer has reviewed and <br /> understands all segments of the SHSP. { <br /> 8: <br /> >r <br /> Si <br /> Signature Date- <br /> LOCAL <br /> ate-LOCAL EMERGENCY TELEPHONE NUMBERS (include area codes): i <br /> Ambulance £'1 l <br /> Hospital Emergency Room <br /> Poison Control Center I-,YC 2 — 9 ;)'IJ <br /> Fire Department �I I <br /> Airport <br /> Explosives Unit a <br /> • E <br /> SF 9174MB/Page 1 a <br />