Laserfiche WebLink
Analysis <br /> On August 9, 1994, the Board of Supervisors heard testimony from several residents of the French Camp <br /> area regarding the installation of a public sewer line in the area by the City of Stockton and how this <br /> sewer line may impact the ability to expand or remodel their existing residences or add additional dwelling <br /> units such as mobile homes to their property. Specifically, Section 9-1105.2(e) of the Development Title <br /> was discussed, which states that mandatory connection to a sewer main is required if an expanded use <br /> generates additional wastewater and if the sewer main is within 200 feet of the nearest property line. After <br /> some discussion, the Board of Supervisors directed the Community Development Department to review <br /> this ordinance and propose an option to provide relief from the ordinance requirement for mandatory <br /> sewer connection. <br /> With input from the Environmental Health Division,the Community Development Department identified one <br /> potential option (which is this proposed Text Amendment) for consideration by the Board of Supervisors. <br /> San Joaquin County TA-94-SiSan Joaquin County <br /> Community Development Page 3 <br />