My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
12 (STATE ROUTE 12)
>
20913
>
2900 - Site Mitigation Program
>
PR0545720
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 3:48:22 PM
Creation date
6/12/2020 11:34:45 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0545720
PE
2952
FACILITY_ID
FA0005524
FACILITY_NAME
A TEICHERT & SON INC
STREET_NUMBER
20913
Direction
E
STREET_NAME
STATE ROUTE 12
City
CLEMENTS
Zip
95812
CURRENT_STATUS
02
SITE_LOCATION
20913 E HWY 12
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Fire/Explosion: Upon notification of a fire or explosion on <br /> site, the designated emergency signal (three horn blast) shall be <br /> sounded and all site personnel assembled. The fire department <br /> shall be alerted and all personnel moved to a safe distance from <br /> the involved area. <br /> Personal Protective Equipment Failure: If any site worker exper- <br /> iences a failure or alteration of protective . equipment that <br /> affects the protection factor, that person and his/her buddy <br /> shall immediately leave the job site. Re-entry shall not be <br /> permitted until the equipment has been repaired or replaced. <br /> Other Equipment Failure: If any other equipment on site fails to <br /> operate properly, Foreman shall 'be '' notified and then determine <br /> the effect of this failure on continuing operations on site. If <br /> the failure affects the safety of personnel or prevents <br /> completion of the Work Plan tasks, all personnel shall leave the <br /> job site until the situation is evaluated and appropriate actions <br /> taken. <br /> The emergency escape routes are designated for use in those <br /> situations where egress from the area cannot occur through the <br /> decontamination line: Leave by the shortest unfenced route . <br /> In all situations, when an on-site emergency results in <br /> evacuation, personnel shall not re-enter until: <br /> 1 . The conditions resulting in theemergency have been <br /> corrected. <br /> 2. The hazards have been reassessed. <br /> 3 . The Site Safety Plan has been reviewed. ' <br /> 4. Site personnel have been briefed on any changes in the Site <br /> Safety Plan. <br /> 5. Personnel Monitoring. <br /> The following personnel monitoring will be in effect on <br /> site: <br /> Personal exposure sampling: Based on Colormetric tubes when <br /> applicable. <br /> Medical Monitoring: The expected air temperature will be 80°F. <br /> If it is determined that heat stress monitoring is required <br /> (mandatory if over 70°F) , the following procedures will be <br /> followed: <br /> Refer to heat stress and other psychological factor <br /> appendix. <br /> PAGE 6 OF 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.