Laserfiche WebLink
existing Koster Road-Vernalis Road intersection and return to the existing Koster Road <br /> alignment about 6,400 feet further north near the Koster Road-State Route 33 intersection. <br /> The new Koster Road bypass would be built by the project developers. <br /> Homes which front on the existing Koster Road would be buffered from this new public <br /> roadway by golf course open space. With the elimination of through traffic, the roadway <br /> connections between the bypassed Koster Road section and its on-site replacement roadway <br /> would be reconfigured to serve only local traffic. <br /> Another major feature of the on-site circulation concept would be a Central Parkway which <br /> loops through the project site, connecting the residential villages to intersections with the <br /> realigned Koster Road at its north and south ends. This street would serve as the major on-site <br /> collector road, designed to distribute traffic to the villages and to direct traffic flow toward the <br /> Koster Road-State Route 132 intersection and to the State Route 33-Interstate Route 5 <br /> interchange. <br /> To make the project residential streets inviting to bikers and pedestrians and to slow traffic, in <br /> general, the streets will be kept narrow, curvilinear and relatively short. On-street parking will <br /> be encouraged, except on collector streets as noted on the next page, further slowing traffic. <br /> Fronting Roads. This development will increase the traffic loads on Durham Ferry Road, <br /> Bevis Road and Vernalis Road which front on the project site. It would be County policy to <br /> require widening and improvement of such adjacent roads. The project developers will widen <br /> these roads along the project site frontage to County standards. <br /> These roadways will be designed to handle the additional project-related traffic load. There <br /> will be adequate capacity on these three roads fronting on the project with the proposed <br /> improvements. <br /> r <br /> Pedestrian Walks. Bikeways and Parking. To enhance the recreation orientation of the <br /> neighborhood and to encourage non-vehicular travel, on- and off-street bike lanes and <br /> walking/jogging paths are proposed on the Concept Site Plan. In on-street locations, the bike <br /> paths will be provided within an eight-foot section of the street right-of-way. <br /> On-street parking is proposed to be limited on any secondary collector street with no parking <br /> allowed on the Central Parkway or the new Koster Road bypass. Parking for the golf <br /> clubhouse and the neighborhood convenience center is proposed to be entirely off-street <br /> according to San Joaquin County development standards. Off-street parking needs for the K-8 <br /> school and for other purposes (e.g. Park and Ride lots) will be defined at a later stage in project <br /> planning. <br /> Open Space Systems <br /> The Concept Site Plan proposes residential development in a series of villages which are <br /> interconnected by internal collector streets and bicycle and pedestrian paths. These individual , <br /> residential villages will be defined by a network of common open space areas, which includes <br /> the golf course, a Nature Preserve and landscaped greenways. <br /> Golf Courses/Clubhouse. The Concept Site Plan proposes the general physical layout for a <br /> tournament length 18-hole golf course. The final design for the golf courses will occur at the <br /> Tentative Map stage. The golf course would be open to all players, regardless of their place of <br /> residence. <br /> 17 <br />