Laserfiche WebLink
GROUNDWATER SAMPLING FORM <br /> PROJECT NAME. (2AP- 11E� 2C ( �T11 WELL NO Z– <br /> zea++�oa�s�Al,owt PROJECT NUMBER Q "32( TYPE. ✓I�iionitor_Extraction Other <br /> RECORDED BY _ 40�' SAMPLED BY DATE- !Zj-1 g tc <br /> WELL PURGING <br /> PURGE VOLUME PURGE METHOD <br /> Wag sing Diamter _Bailer-Type <br /> 2-- h _„4-aich —other fLPump-Typo st,4 <br /> Wag Totai Depth(TD h baiow TOC) Z 7 $Q _other-Spacsfy <br /> Depth to Water{WL,ft baiow TOCI 9 OS Hydrocarbon Od <br /> _YES NO <br /> Water Column Length%a 15-- <br /> No of Wage to be Purged X3 10 Othor <br /> Purge Volume Calculation(Water cai,ar„L=am a hiluitarir:Me Vale _ Cak fated Purge Vokmnei <br /> t 115- X 0.1-14 X 3 = C1 0 Calculated Purge Volume = _ �1 6)0 gis <br /> MICU (Multipl r, {No. Vols} Actual Purge Volume = -22 D gis <br /> huhu plies Mani g Dia 2naheal - Golonalltnear ft) 2=O-t7 4-0 66 6'=f 5 B=2 6 <br /> Groundwater Parameter Measurement. Meter Type YS/ 35a 0 Calibrated Yes No <br /> TIMEIGALLONS DTW pH CONDUGP TURBIDITY COMMENTS <br /> {ft) Tlvrrydeg c (NTU! (COLORIODOR) <br /> deg F <br /> 4 L4�A 1'7, l rJ�. � ,I- � a <br /> o (� 5 1 <br /> ,7g 2-,10 1 3 rJP� 4 - tj a <br /> 09'e S ,77 �a 2-e�O 1 19 6 r.,3 P, at 1/6111in 0 <br /> a 5 <br /> q- 79 G q 2-W 19, 5 Al A <br />