My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0012739
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
THORNTON
>
26056
>
2900 - Site Mitigation Program
>
PR0545730
>
ARCHIVED REPORTS_XR0012739
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/12/2020 12:25:10 PM
Creation date
6/12/2020 12:02:10 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012739
RECORD_ID
PR0545730
PE
2957
FACILITY_ID
FA0005194
FACILITY_NAME
DONNA GARDNER
STREET_NUMBER
26056
STREET_NAME
THORNTON
STREET_TYPE
RD
City
THORNTON
Zip
95686
APN
00115046
CURRENT_STATUS
02
SITE_LOCATION
26056 THORNTON RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
343
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
will be decontaminated prior to commencing drilling at each <br /> hole. Well construction materials will be cleaned as <br /> w necessary, prior to installation. <br /> r Equipment and well material decontamination will be <br /> conducted on an impermeable surface and all decontamination <br /> effluent will be contained. All .surfaces of the equipment <br /> will be thoroughly decontaminated using a steam cleaner. <br /> The equipment will be placed on a drying rack for air <br /> drying. The decontamination water will stored in containers <br /> c3rtified for hazardous materials storage and disposed of in <br /> an approved manner. <br /> Sample equipment to be used for <br /> pesticides and organic <br /> analysis will be washed in a nonphosphate detergent (Alconox <br /> or equivalent) and rinsed with tap water, followed by <br /> deionized water and finally with acetone. If the equipment <br /> is for metals analysis, the initial rinse will be conducted <br /> with 0.1 N nitric acid followed by tap water and deionized <br /> water. <br /> 7.0 Field Equipment Calibration and Maintenance <br /> The following measuring equipment may be used during the <br /> Remedial Investigation. Equipment is grouped by field <br /> activity. Calibration procedures and frequency are listed <br /> for each piece. <br /> Soil 9orings and Well Dimensions-Steel and coated cloth <br /> tape. Calibration: none. <br /> Water Level Measurements in Wells- Steel surveyors tape. <br /> Calibration: manufacturer supplied tempera--,are correction <br /> will be applied as applicable for fief , conditions. <br /> Electrical well sounders. Calibration: chec:c against steel <br /> 17 surveyor's tape. <br /> Organic Va ors- Photoionization detector. Calibration: <br /> Daily field Calibration using a isobutylene standard as per <br /> manufacturers instrur.tions. <br /> Groundwater pH Measurement- Digital pH meter. Calibration: <br /> standard pH solutions of 4, 7, and 10 will be utilized for <br /> daily field calibration according to manufacturers <br /> instructions. <br /> Electrical Conductivity- Electrical conductivity meter. <br /> Calibration: factory-calibrated annually and periodically <br /> calibrated against laboratory prepared standard calibration <br /> solution. <br /> Water Temperature- Mercury or digital thermometers. <br /> Calibration: factory-calibrated once. <br /> r <br />
The URL can be used to link to this page
Your browser does not support the video tag.