My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0012739
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
THORNTON
>
26056
>
2900 - Site Mitigation Program
>
PR0545730
>
ARCHIVED REPORTS_XR0012739
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/12/2020 12:25:10 PM
Creation date
6/12/2020 12:02:10 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012739
RECORD_ID
PR0545730
PE
2957
FACILITY_ID
FA0005194
FACILITY_NAME
DONNA GARDNER
STREET_NUMBER
26056
STREET_NAME
THORNTON
STREET_TYPE
RD
City
THORNTON
Zip
95686
APN
00115046
CURRENT_STATUS
02
SITE_LOCATION
26056 THORNTON RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
343
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> sampling, latex gloves will be. worn to prevent cross <br /> contamination with other samples. One pair of disposable <br /> ;3 <br /> gloves will be dedicated to each sample collected. <br /> Once the sample is collected, each end of the cylinder will <br /> be sealed with aluminum foil or teflon tape and then capped <br /> with a polyethylene lid, taped, and labeled. The sample <br /> will then be individually sealed in a ziplock bag and <br /> 14 immediately placed in an ice chest containing dry ice or <br /> frozen chemical ice for delivery to a state certified <br /> laboratory. Sample identification, storage and <br /> transportation will be conducted as outlined in the previous <br /> 4 section. <br /> 11.5 Sampling from Soil Piles or Shallow Soil Pits <br /> Soil samples will be collected and transported from <br /> excavated material in the manner described in the previous <br /> section, however, a backhoe will not be utilized. if <br /> composite samples are collected, four brass cylinders will <br /> be collected for every 50 cubic yards of material to be <br /> sampled unless otherwise specified by the lead regulatory <br /> x agency. The samples will be composited by the state <br /> i ; certified analytical laboratory personnel prior to testing. <br /> t , 12.0 Groundwater Sampling Protocol <br /> r ' Prior to arriving at the sampling site, all sampling <br /> equipment will be washed with laboratory grade detergent, <br /> p and rinsed twice with tap water, once with acetone, and once <br /> with deionized water. This procedure will be carried out <br /> on-site before sampling of other monitoring wells, if more <br /> f } than one well is to be sampled with the same sampling <br /> device. <br /> Immediately prior to sampling, the depth to water (DTW) in <br /> the well will be recorded. The thickness of product on top <br /> of the groundwater, if present, will be measured using an <br /> interface probe. The procedure for monitoring is presented <br /> t in Section 9.0 (Groundwater Monitoring Protocol). <br /> If .free product is detected, analysis of groundwater at the <br /> ! } interface for dissolved product will not be conducted. A <br /> product sample will be collected for source identification. <br /> If all free product cannot be removed, an interval specific <br /> sampling device may be utilized to collect: a sample from <br /> below the zone of free product. Before collecting at least <br /> two groundwater samples from each well, the well will be <br /> 1 purged until indicator parameters (temperature, conductivity <br /> and pH) stabilize. This will entail the removal of at least <br /> four well casing volumes by bailing or pumping. The <br /> criteria for determining well casing volumes and temporary <br /> storage of purged water is outlined in Section 10.0, (Well <br /> Development Protocol). The indicator parameter, measurements <br /> will be taken both before and after purging of each well <br />
The URL can be used to link to this page
Your browser does not support the video tag.