Laserfiche WebLink
,u <br /> 4.y <br /> WaterWork <br /> Health and Safety Plan <br /> Underground Tank Investigation <br /> INTRCOUCTION <br /> PURPOSE AND SCOPE <br /> The Health and Safety Pian, for underground tank investigations, <br /> provides for the protection of on-site personnel and the <br /> surrounding community during site characterization activities. <br /> -- The requirements, specifications and procedures presented with <br /> this plan will apply to all personnel on-site, including <br /> employees, sub-contractors, site visitors and regulatory agency <br /> personnel. <br /> KEY PERSONNEL <br /> WaterWork's Safety Coordinator/Project Manager will provide <br /> training to site personnel in the use of safety and personal <br /> protection equipment and will manage the on-site monitoring <br /> program. The Safety Coordinator/Project Manager will have <br /> the <br /> authority to deny access to any individual without the proper <br /> training or protective equipwent required for the site conditions <br /> or those individuals disregarding site safety procedures. All <br /> - site personnel will be under the direction of the Safety <br /> Coordinator/Project Manager. <br /> y HAZARD ANALaYSIS <br /> The property previously operated a gasoline and/or diesel fuel <br /> - distribution facility. Historic data and evaluation of <br /> subsurface indicate the presence or potential presence of <br /> hydrocarbon fuel. contamination. <br /> The activities addressed by this safety plan include surface and <br /> subsurface soil and groundwater sample collection. Although <br /> exposure at hazardous levels are unlikely, these activities <br /> present the potential for exposure to toxic materials through <br /> hoth skin contact and inhalation. The subsurface sampling may <br /> also pose a fire and explosion hazard from gases and vapors <br /> trapped beneath the ground surface. <br />