Laserfiche WebLink
DRAFT Ver. 1-C-doc-4-5-1 0 <br /> Tier II Qualified Facility SPCC Plan <br /> This template constitutes the SPCC Plan for the facility, when completed and signed by the owner or operator of a <br /> facility that meets the applicability criteria in §112.3(g)(2). This template addresses the requirements of 40 CFR part 112. <br /> Maintain a complete copy of the Plan at the facility if the facility is normally attended at least four hours per day, or for a <br /> facility attended fewer than four hours per day, at the nearest field office.When making operational changes at a facility <br /> that are necessary to comply with the rule requirements, the owner/operator should follow state and local requirements <br /> (such as for permitting, design and construction)and obtain professional assistance, as appropriate. <br /> Facility Description <br /> Facility Name CALIFORNIA FREIGHT ACAMPO <br /> Facility Address 19501 N HWY 99 <br /> City ACAMPO State CA ZIP 95220 <br /> County SAN JOAQUIN Tel. Number (209 ) 367.8753 <br /> Owner or Operator Name SANDAIR INC DBA CALIFORNIA FREIGHT SALES <br /> Owner or Operator Address 805 S LOCUST AVE <br /> City RIPON State CA ZIP 95366 <br /> County SAN JOAQUIN Tel. Number (209 )599 _5024 <br /> I. Self-Certification Statement (§112.6(b)(2)) <br /> The owner or operator of a facility certifies that each of the following is true in order to utilize this template to comply <br /> with the SPCC requirements: <br /> I PAUL HAMILTON certify that the following is accurate: <br /> 1. 1 am familiar with the applicable requirements of 40 CFR part 112; <br /> 2. 1 have visited and examined the facility; <br /> 3. This Plan was prepared in accordance with accepted and sound industry practices and standards, and with the <br /> requirements of 40 CFR part 112; <br /> 4. Procedures for required inspections and testing have been established; <br /> 5. 1 will fully implement the Plan; <br /> 6. This facility meets the following qualification criteria (under§112.3(g)(2)): <br /> a. The aggregate aboveground oil storage capacity of the facility is 10,000 U.S. gallons or less; and <br /> b. The facility has had no single discharge as described in §112.1(b) exceeding 1,000 U.S. gallons and no <br /> two discharges as described in §112.1(b) each exceeding 42 U.S. gallons within any twelve month period <br /> in the three years prior to the SPCC Plan self-certification date, or since becoming subject to 40 CFR part <br /> 112 if the facility has been in operation for less than three years (not including oil discharges as described <br /> in §112.1(b)that are the result of natural disasters, acts of war, or terrorism). <br /> 7. The Plan does not deviate from any requirement of this part as allowed by§112.7(a)(2)and 112.7(d), or include <br /> an exemption/measures pursuant to §112.9(c)(6)for produced water containers and any associated piping and <br /> appurtenances downstream from the container, except as provided in §112.6(b)(3); and <br /> 8. This Plan and individual(s) responsible for implementing this Plan have the full approval of management and I <br /> have committed the necessary resources to fully implement this Plan. <br /> Facility Name: <br /> CALIFORNIA FREIGHT ACAMPO Page 1 Tier 11 Qualified Facility SPCC Plan <br />