Laserfiche WebLink
DRAFT Ver. 1-C-doc-4-5-1 0 <br /> III. Plan Requirements <br /> 1. Facility Diagram (§112.7(a)(3)): SEE ATTACHED SITE MAP <br /> Table G-2 Facility Diagram <br /> Describe in your Plan the physical layout of the facility and include a facility diagram, which must mark the <br /> location and contents of each fixed oil storage container and the storage area where mobile or portable <br /> containers are located'. The facility diagram must identify the location of and mark as "exempt" <br /> underground tanks that are otherwise exempted from the requirements of this part under§112.1(d)(4), <br /> and produced water containers and any associated piping and appurtenances downstream from the <br /> container, that are otherwise exempted from the requirements of this part under§112.1(d)(12). The facility <br /> diagram must also include all transfer stations (such as tank loading and unloading areas) and connecting <br /> pipes, including intra-facility gathering lines that are otherwise exempted from the requirements of this part <br /> under§112.1(d)(11). (§112.7(a)(3)] <br /> A B C D E F G H I J K L M N O P Q R S T U V W X Y <br /> 1 <br /> 2 <br /> 3 <br /> 4 <br /> 5 <br /> 6 <br /> 7 <br /> 8 <br /> 9 <br /> 10 <br /> 11 <br /> 12 <br /> 13 <br /> 14 <br /> 15 <br /> 16 <br /> 17 <br /> 18 <br /> 19 <br /> 20 <br /> 21 <br /> 22 <br /> 23 <br /> 24 <br /> a The location and contents may be marked by identifying each tank/container and portable container storage area on the <br /> diagram above with an ID code and including the ID code on Table G-3 on the following page. <br /> Page 3 Tier 11 Qualified Facility SPCC Plan <br />