Laserfiche WebLink
DRAFT Ver. 1-C-doc-4-5-1 0 <br /> 3. Oil Spill Control (§§112.7(a)(3)(ii) & (iii)): <br /> Table G-4 Oil Spill Control <br /> Discharge prevention measures including procedures for routine handling of oil products (loading, II <br /> unloading and facility transfers) have been created and are being implemented. (§112.7(a)(3)(ii)] X <br /> The following is a description, listing or summary of the procedures for routine oil handling in place at this facility: <br /> - Fuel supplier connects to fill pipes to fill our fuel tank and maintains responsibility for any leakage <br /> or spill during loading <br /> - Our drivers fuel their tractor at the end of each shift using an electric powered fuel pump system <br /> Discharge or drainage controls such as secondary containment around containers and other structures, II <br /> equipment, and procedures for the control of a discharge have been implemented. (§112.7(a)(3)(iii)] X <br /> The following is a description, listing or summary of the discharge controls and procedures in place at this facility: <br /> -Appropriate secondary containment and/or diversionary structures or equipment is provided for handling <br /> all fuel at our fueling location to prevent a discharge to navigable water or adjoining shoreline. The entire <br /> secondary containment system, including floor and walls, is capable of containing fuel and is constructed so <br /> that any discharge from the fuel tank will not escape the containment system before cleanup occurs. <br /> CALIFORNIA FREIGHT AC) <br /> Facility Name: Page 5 Tier 11 Qualified Facility SPCC Plan <br />