Laserfiche WebLink
SUMIDEN WIRE PRODUCTS CORPORATION <br /> SLUG DISCHARGE CONTROL PLAN <br /> Page 1/1 <br /> Ref: TD-201 APPENDIX # 1 <br /> Check List of Pickling and Wastewater balance area Start—Up and Shut—Down <br /> MO: Supervisor—and/or—Maintenance Operator, PO: Supervisor—and/or—Pickling Operator <br /> START—UP SHUT—DOWN <br /> Resp. Resp <br /> No. Operation Item MO PO No. Operation Item MO PO <br /> 1 Turn on disconnect switches that are X 1 Close main steam valve to acid tank if X <br /> in the off position required <br /> 2 Open main steam valve to acid tank if X 2 Push mixer stop switch#13&14 X <br /> closed Balance tanks—MCC—B <br /> 3 Open main steam valve to the coating X 3 Close main steam valve to the rod X <br /> bath if closed coating tank if required <br /> 4 Check the temp.control panel for X 4 Recorder&Sampler power must X <br /> proper operation remain on at all times <br /> Push mixer start switches on MCC—B, <br /> X 5 Turn P-7,P-7A Switch to OFF X <br /> 5 13&14,bal.tanks <br /> Look for leaking pipe joints on all lines Turn NAOH(Caustic Soda)and Acid <br /> 6 for pH balance control X 6 selector switchs off&Close ball X <br /> valves in waste water <br /> 7 Turn P-7,P-7A Selector Switch to X 7 Push stop switch for push fan to turn X <br /> Auto off <br /> Turn 1 st Stage&2nd Stage NAOH Push stop switch for Pull fan(Acid <br /> 8 selector switch's to AUTO and open X 8 Bath Scrubber) X <br /> ball valves in waste water <br /> 9 Turn on main disconnect switch of X 9 Push stop switch for pull fan for X <br /> MCC—D if off Coating Bath <br /> 10 Check select switch position should X 1 0 Push stop switch for P-1 Pump in X <br /> be""manual""MCC—D MCC—D <br /> 11 Push start switch of P-1 Pump in X 1 1 Do a Safety Check walk around X <br /> MCC—D Wastewater Area <br /> 12 Push start switch of pull—fan MCC—D X 1 2 Do a Safety Check walk around X <br /> (Acid Fume Scrubber) Pickling Area <br /> Push Start Switch of Cross flow vent <br /> 13 fan,MCC—D X <br /> 14 Push start switch for pull—Fanfor X <br /> Coating Bath <br /> Notes/Comments: <br /> Revised 6/27/14 wm slug plan Appendix 1.xls <br />