My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
V
>
VAL DERVIN
>
107
>
2200 - Hazardous Waste Program
>
PR0505919
>
COMPLIANCE INFO_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/12/2020 6:43:15 PM
Creation date
6/12/2020 5:27:37 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
2019
RECORD_ID
PR0505919
PE
2220
FACILITY_ID
FA0007083
FACILITY_NAME
B & C PAINTING SOLUTIONS INC
STREET_NUMBER
107
STREET_NAME
VAL DERVIN
STREET_TYPE
PKWY
City
STOCKTON
Zip
95206
APN
19337005
CURRENT_STATUS
01
SITE_LOCATION
107 VAL DERVIN PKWY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
187
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Alaniz, John <br /> From: Norm Lumpkin <nlumpkin@bcpaintingsolutions.com> <br /> Sent: Monday, April 22, 2019 10:37 AM <br /> To: Alaniz, John <br /> Cc: Gary Maggard <br /> Subject: Item #102 <br /> Attachments: 5 Stage Wash Map.docx <br /> Good morning Mr.Alaniz, <br /> We are preparing to do our annual wash tank cleaning and I would like to address the analytical issues that were <br /> referenced in Item#102. 1 had spoken with Phil Freemouw who had pulled the samples for our wash.The samples were <br /> pulled from Tank#1 and Tank#2. Analytical workorder number 170895. 1 am enclosing a drawing of the tank system <br /> and what each tank is comprised of. We have two chemical tanks. Tank#1 and Tank#3. Both carry an Iron Phosphate <br /> solution of Bulkbond 990 detergent and Tank#1 also utilizes Bulksol 10 which helps maintain the cleaning integrity of <br /> the tank. The other three tanks,#2,#4 and #5 are comprised of deionized rinse water. The process we use for emptying <br /> and cleaning of tanks is: We have Freemouw Environmental completely pump out Tank#1 and Tank#2. After that is <br /> completed Tank#3 is moved into Tank#1, becoming the new wash tank for the next 6-12 months until the cleaning is <br /> done again. Tanks 4 rinse water is moved into Tank#3 and Bulbond 990 is added to recharge that tank. I am attaching a <br /> tank layout for reference. Is not the analytical that Freemouw completed an accurate assessment of the waste <br /> properties? I apologize if I didn't explain the system in an understandable manner, I am thinking that the analytical <br /> completed would give an accurate assessment of the waste properties since tank#1 is actually initially made up of the <br /> tank#3 and once it is filled, Bulksol 10 is what maintains it's cleaning properties. Item #102 states that a separate waste <br /> determination needs to be done for each tank but only Tank#1 and#2 are the waste tanks that get pumped out and <br /> cleaned at each service. If you require that I have Freemouw Environmental do another pull sample, would doing it <br /> again on Tank#1 and Tank#2 suffice? I appreciate your time and guidance. <br /> Norman Lumpkin <br /> B&C Painting Solutions Inc. <br /> 107 Val Dervin Parkway <br /> Stockton, California 95206 <br /> 1.209.982.0422 Office <br /> 1.209.982.5844 Fax <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.