My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2020
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
ESCALON BELLOTA
>
15658
>
1900 - Hazardous Materials Program
>
PR0514764
>
COMPLIANCE INFO_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2020 9:15:45 AM
Creation date
6/15/2020 9:14:52 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
1900 - Hazardous Materials Program
File Section
COMPLIANCE INFO
FileName_PostFix
2020
RECORD_ID
PR0514764
PE
1861
FACILITY_ID
FA0010322
FACILITY_NAME
MID VALLEY AG SVC
STREET_NUMBER
15658
STREET_NAME
ESCALON BELLOTA
STREET_TYPE
RD
City
ESCALON
Zip
95320
CURRENT_STATUS
01
SITE_LOCATION
15658 ESCALON BELLOTA RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SAN J O A Q U l N Environmental Health Department <br /> � vUN I I <br /> CA Accidental Release Prevention Program Inspection Report <br /> Facility Name: Facility Address: Date: <br /> MID VALLEY AG SVC 15658 ESCALON BELLOTA RD, ESCALON June 09, 2020 <br /> Program 3 Prevention Program <br /> 638 CCR 2760.7(b) Failed to confirm pre-startup safety review prior to introducing regulated substances to a process o V o R o COS <br /> Compliance Audits <br /> 639 CCR 2760.8(a) Failed to certify a compliance audit at least every three years o V o R o COS <br /> 640 CCR 2760.8(b) Failed to include at least one person knowledgeable in the process for the compliance audit o V o R o COS <br /> 641 CCR 2760.8(c) Failed to develop a complete report of the compliance audit findings o V o R o COS <br /> 642 CCR 2760.8(d) Failed to promptly determine/document an appropriate response to all audit findings/dates corrected o V o R o COS <br /> 643 CCR 2760.8(e) Failed to retain the two most recent compliance audit reports o V o R a COS <br /> Incident Investigation <br /> 644 CCR 2760.9(a) Failed to investigate an actual or potential catastrophic release o V o R o COS <br /> 645 CCR 2760.9(b) Failed to promptly initiate an incident investigation not later than 48 hrs.following the incident o V o R o COS <br /> 646 CCR 2760.9(c) Failed to establish a complete incident investigation team to investigate/analyze the incident o V c R a COS <br /> 647 CCR 2760.9(d) Failed to prepare a complete report at the conclusion of the incident investigation o V o R o COS <br /> 648 CCR 2760.9(e) Failed to establish system to address/resolve/document the incident report findings/recommendations o V o R o COS <br /> 649 CCR 2760.9(f) Failed to review the findings of the incident investigation with all affected personnel o V o R a COS <br /> 650 CCR 2760.9(g) Failed to retain incident investigation reports for five years o V a R o COS <br /> Employee Participation <br /> 651 CCR 2760.10(a) Failed to develop/implement a written plan of action for employee participation o V o R o COS <br /> 652 CCR 2760.10(b) Failed to consult with employees regarding the PHA/elements of process safety management o V o R o COS <br /> 653 CCR 2760.10(c) Failed to provide access for the employees to the PHA and all RMP information o V o R o COS <br /> Hot Work Permit <br /> 654 CCR 2760.11(a) Failed to issue a hot work permit for operations conducted on or near a covered process o V o R o COS <br /> 655 CCR 2760.11(b) Failed to completely documentfimplement a hot work permit prior to operations o V o R o COS <br /> 656 CCR 2760.11(b) Failed to keep a hot work permit on file until operations were completed c V o R o COS <br /> Contractors <br /> 657 CCR 2760.12(b) Failed to implement all required responsibilities when utilizing a contractor on/next to a process o V o R o COS <br /> 658 CCR 2760.12(c) Failed to ensure that all required responsibilities of the contractor have been implemented o V o R o COS <br /> Emergency Response(ER) Program 2 or 3 <br /> 701 CCR 2765.1(b) Failed to meet all of the requirements for not having an ER Program for accidental releases ❑V o R o COS <br /> 702 CCR 2765.2(a) Failed to develop/implement an ER program that includes all of the required elements ❑V o R o COS <br /> 703 CCR 2765.2(c) Failed to coordinate the facility ER plan with the community ER plan and/or have the required format o V o R o COS <br /> 704 CCR 2765.2(c) Failed to promptly provide information necessary for the community ER plan o V o R o COS <br /> Other Requirements <br /> 901 CCR 2775.1 Failed to maintain RMP implementation records for five years unless otherwise provided in Article 6 o V o R n COS <br /> Technical Assistance <br /> 1101 CCR 2785.1(a) Failed to coordinate with the EHD to ensure apropriate technical standards are applied o V o R o COS <br /> FA0010322 PR0514764 SCO01 06/09/2020 <br /> EHD 19-02 Rev.9/20/2019 Page 5 of 7 CA Accidental Release Prevention Program OIR <br /> 1868 E. Hazelton Avenue I Stockton, California 952051 T 209 468-3420 1 F 209 464-0138 1 www.sjcehd.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.