My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE_CASE 1
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
TURNER
>
90
>
2900 - Site Mitigation Program
>
PR0545765
>
SITE INFORMATION AND CORRESPONDENCE_CASE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2020 11:12:54 AM
Creation date
6/15/2020 11:09:30 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
CASE 1
RECORD_ID
PR0545765
PE
3528
FACILITY_ID
FA0003657
FACILITY_NAME
AT&T Corp. - UE231
STREET_NUMBER
90
Direction
W
STREET_NAME
TURNER
STREET_TYPE
Rd
City
Lodi
Zip
95242
CURRENT_STATUS
02
SITE_LOCATION
90 W Turner Rd
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CVRWQCB/Elizabe:th Thayer for direction. Due <br /> to low concentrations of diesel found in <br /> groundwater from time to time, an additional <br /> MW will be requested downgradient to determine <br /> soil and groundwater conditions SW of the <br /> former tank field. <br /> 5/20/93 One additional monitoring well (#4) installed <br /> SW of contaminated area. <br /> 5/22/93 ESE' s report dated June 11, 1993 .indicated <br /> soil and groundwater conditions ND for MW#4. <br /> 9/2/93 Second Qt. Report dated Aug. 17, 1993 ' <br /> indicated low diesel 'concentrations in MW #1 <br /> and #4 (200ppb diesel, BTEX ND) . <br /> 11/15/93 Third Qt. Report indicated all MWs ND for BTEX <br /> and diesel. <br /> 2/11/94 Fourth Qt. Report again indicated all MWs ND <br /> for BTEX and diesel ( .second consecutive round <br /> of groundwater 'results ND) . <br /> .12/28/94 EHD completed review of Site Closure Report <br /> prepared by ESE ':and dated Nov. 28, 1994 . Site <br /> closure letter prepared for CVRWQCB <br /> concurrence. <br /> 03/31/95 Two well destruction permits issued for abandonment of <br /> one off site and three on site monitoring wells. <br /> i <br /> 04/13/95 EHD verified ove'rdrilling and grouting of four monitoring <br /> well completed 04/12/95. <br /> 04/25/95 Site closure correspondence for CVRWQCB and R.P.processed <br /> for mailing. <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.