Laserfiche WebLink
F, <br /> MT <br /> 1.2 Activities for this Report <br /> ESE personnel returned to the site on February 6, 1991 to purge and sample the three <br /> monitoring wells. In addition, soil samples were collected from the soil piles generated <br /> by the drilling of the monitoring wells. This report documents the results of the February <br /> C, 1991 sampling. <br /> -..e' Fj..150.`01nTdTLtlD1.RiT 4 <br />