Laserfiche WebLink
S ^', � O Environmental Health Department <br /> C O U N T Y :.._.__.. <br /> UST SYSTEM RETROFIT OR REPAIR <br /> (Submit minimum of 3 sets of plans & applications as originals will be retained by EHD) <br /> 1 . Site map enclosed? YES [ ] NO [ j <br /> 2 . Submit copies of ICC Service Technician and/or Installer' s certificate and all manufacturer training <br /> certificates for each person installing or testing any component that is repaired or replaced . Ensure a copy of <br /> the " Site Health and Safety Plan" is available on the jobsite as required by Title 8 . <br /> 3 . Detailed description of work to be completed . List components to be repaired or replaced and attach a <br /> diagram drawn to scale showing location of repairs and/or replacements . If repairing a component , describe <br /> how this will be done . ( If adding piping , UDC ' s , or other UST equipment , or performing tank top upgrade , <br /> use the UST Installation Application pages 4-8 as necessary for a timely plan review) : <br /> Replaced a Veeder- Root 205 sensor with a Veeder- Root 208 sensor . <br /> Replaced a 208 sensor like for like in UDC # 1 -2 <br /> 4 . List of equipment to be used (Attach manufacturer' s specification sheets showing third-party approval) : <br /> VR 794380-208 Sump Sensor <br /> 5 . Decontamination Procedures : <br /> a . Will piping be decontaminated prior to removal ? YES [ ] NO [A <br /> b . Identify contractor performing decontamination : <br /> Name Phone <br /> Address City Zip <br /> 3of6 <br />