Laserfiche WebLink
f ✓ I <br /> JOHN TOUNGER <br /> I <br /> PAGE 2 <br /> (209) 937-8722. <br /> l <br /> Taking into consideration the above discussion, please submit a workplan to <br /> PHS/EHD to describe the proposed over-excavation of the impacted area in more <br /> detail. Please include a time schedule for the implementation of the workplan, the <br /> method proposed to backfill the open excavation, and a storage and disposal plan for <br /> the removed soil and groundwater. <br /> If you have any questions or wish to discuss this letter in more detail, please contact <br /> Linda Turkatte, Senior REHS, at (209) 468-3441. <br /> Donna Heran, REHS; Director <br /> Environmental Health Division <br /> I ' <br /> Linda Turkatte, Senior REHS Diane M. Hinson, REHS ; <br /> Site Mitigation Unit Supervisor <br /> C' CVRWQCB, Beth Thayer <br /> c: SWRCB Cleanup Fund, Lydia Bracco <br /> c: Di Salvo Trucking, Charlie Lawlor <br /> c: Oil Equipment!Services, Keith Tailia <br /> c: Condor Earth Technologies, Robert Job <br /> r <br /> f <br /> t <br />