Laserfiche WebLink
Condor Earth Technologic;Inc. <br /> Health and Safety Plan <br /> 4.1 Underground/Above Ground Utilities <br /> The potential for contact with live underground/above ground utilities during the drilling is <br /> possible at the site. Underground Service Alert (USA) must be notified prior to field work to <br /> identify known utilities. Di Salvo Truck Lines will be responsible for-identifying, <br /> deactivating, and removing underground/above ground utilities. Site-personnel must be made <br /> aware of known utility locations. if an unknown.utility is encountered during the fieldwork, i <br /> Di Salvo Truck Lines will notify the appropriate utility agency. The fire department will be <br /> notified duringwi emergency: <br /> 4.2 Drilling <br /> Drilling contractors will be responsible for-performing the drilling and adhering to standard <br /> safety procedures.. The-exclusion.zone for the drill rig work area will be a 30-foot radius. <br /> around the rig. Only authorized personnel will be permitted-within the exclusion zone. No <br /> ` smoking will be permitted in the exclusion zone. V <br /> 4.4 .Noise _ <br /> Noise may be'a hazard in the vicinity of excavators and drill rigs. Hearing protection will be <br /> worn when working near heavy equipment or loud mechanical equipment. , <br /> 4.5 -Heat Stress 1 <br /> Heat stress will be'a hazard during hot weather and will be intensified-when workers are in <br /> protective clothing.- Workers will be required to take breaks,-as needed, to'prevent heat stress <br /> and to consume adequate quantities of liquid. - <br /> Page. -3 of 5- it <br /> k <br />