My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
12 (STATE ROUTE 12)
>
340
>
2900 - Site Mitigation Program
>
PR0545713
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 3:47:20 PM
Creation date
6/15/2020 2:29:09 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0545713
PE
2965
FACILITY_ID
FA0013507
FACILITY_NAME
VAN RUITEN FAMILY WINERY
STREET_NUMBER
340
Direction
W
STREET_NAME
STATE ROUTE 12
City
LODI
Zip
95242
APN
05802005
CURRENT_STATUS
02
SITE_LOCATION
340 W HWY 12
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
TSok
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
66
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ATTACHMENT C - 2 - <br /> Monitoring <br /> 2 -Monitoring Well Installation Workplan <br /> Monitoring Well Installation Report <br /> D. Well Development: <br /> Require a minimum of 48 hours prior to development activities <br /> Method of development to be used <br /> Method of determining when development is complete <br /> Parameters to be monitored during development <br /> Method of development water storage and disposal <br /> E. Well Survey: <br /> Identify the Licensed Land Surveyor or Civil Engineer that will perform the survey <br /> Describe what well features will be surveyed (i.e. top of casing, horizontal and vertical <br /> coordinates, etc.) <br /> Vertical accuracy shall be to at least 0.01 foot <br /> F. Soil Sampling(if applicable): <br /> Analyses to be run and methods <br /> Sample containers, collection method, and preservation method <br /> Table describing sample volumes, sample containers,preservation agents, and hold times <br /> Intervals at which soil samples are to be collected <br /> Number of soil samples to be analyzed and rationale <br /> Location of soil samples and rationale <br /> QA/QC procedures <br /> G. Well Sampling: <br /> Minimum time after development before sampling (48 hours) <br /> Well purging method and amount of purge water <br /> Sample containers, collection method, and preservation method <br /> Table describing sample volumes, sample containers, preservation agents, and hold times <br /> QA/QC procedures <br /> H. Water Level Measurement: <br /> The elevation reference point at each monitoring well shall be within 0.01 foot. Ground <br /> surface elevation at each monitoring well shall be within 0.01 foot. Method and time of water <br /> level measurement shall be specified. <br /> I. Proposed time schedule for work. <br /> SECTION 2—Groundwater Sampling and Analysis Plan <br /> A. General Information: <br /> Purpose of well sampling <br /> Site Location <br /> Monitoring well locations <br /> Monitoring well construction details including elevation, well depth, casing material and size, <br /> and screen interval <br /> Equipment decontamination procedures <br />
The URL can be used to link to this page
Your browser does not support the video tag.