Laserfiche WebLink
0 <br /> ethylbenzene were detected at 620 parts per billion (ppb), 8.6 ppb, and 16 ppb, respectively <br /> No benzene, toluene, or TPHd were detected in the samples. Groundwater analytical results <br /> are summarized on Table 2 Laboratory data with chain of custody documentation are <br /> included as Attachment 3 <br /> WORD IN ]PROGRESS AND RECOMMENDATIONS <br /> Approximately 100 cubic yards of remediated soil and construction debris remain on site. It is <br /> anticipated that the remaining soil and construction debris will be transported to a licensed <br /> landfill for disposal during May 1995 It is also anticipated that a portion of the newly <br /> installed asphalt pavement will be removed and additional soil will be placed to repair <br /> subsidence due to poor compaction along the eastern edge of the former excavation in the <br /> vicinity of former well MW 1 <br /> Due to the low level of hydrocarbons detected in samples collected from well MW 1R, SMTH <br /> recommends conducting a confirmation sampling round on this well during the second quarter <br /> of 1995 <br /> Please call John Lane at (209) 838-3507 if you have any questions or comments regarding the <br /> subject site <br /> Very Truly Yours, <br /> Canonie/Smith Environmental Technologies Corporation <br /> .Kohn P Lane <br /> Project Geologist <br /> err. VU, <br /> a <br /> Jeanne Homsey Exp --12,0.x. <br /> CA Registered Civil Engineer No C47410 ,tr 4%, <br /> JPL <br /> Attachments <br /> cc John Dieckman <br /> Mehran Massih <br /> CRWQCB <br /> 1500591SR051095 doc 3 <br />