My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FIELD DOCUMENTS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
V
>
VERA
>
1210
>
3500 - Local Oversight Program
>
PR0545792
>
FIELD DOCUMENTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2020 2:47:08 PM
Creation date
6/15/2020 2:37:05 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
FIELD DOCUMENTS
RECORD_ID
PR0545792
PE
3528
FACILITY_ID
FA0009410
FACILITY_NAME
RIPON PW WELLS (CORP YARD)
STREET_NUMBER
1210
Direction
S
STREET_NAME
VERA
STREET_TYPE
AVE
City
RIPON
Zip
95366
APN
25933004
CURRENT_STATUS
02
SITE_LOCATION
1210 S VERA AVE
P_DISTRICT
005
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
179
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CLEARWATER <br /> G R O' U P, I N C. <br /> boring in the location shown on Figure 2. The 8-inch-diameter soil boring <br /> will be drilled to a depth of approximately 0 feet bgs. Soil samples will be <br /> collected at five-foot intervals from 5 feet bgs to 20 feet bgs (a total of four soil <br /> samples from the soil boring). <br /> - Clearwater proposes to drill and 'sample f Dur additional soil borings and <br /> convert them-to monitoring wells (PMW-4 through PMW-7) at the locations <br /> shown on Figure 2. .Because the direction o groundwater.flow at the subject <br /> location is uncertain, - monitoring well to ations 'were selected. to provide <br /> water level .data from.widely-spaced points around the former locations of the <br /> _. USTs and the fuel.dispenser. <br /> Clearwater will drill the soil borings and c nstruct the monitoring wells in <br /> the manner shown on Figure 3 and describe below: <br /> • Four 8-inch-diameter soil borings will be drilled and converted to 2-inch- <br /> diameter monitoring wells <br /> Total depth of each monitoring well will e"30 feet bgs <br /> - • Soil samples will be collected at five-f oot intervals; 'samples collected <br /> between-the depths of .15 and 30 feet bgs will:be submitted:.to_a.laboratory <br /> for analyses of petroleum.hydrocarbons <br /> • Wells will be constructed of 2-inch-dia- eter, Schedule 40 PVC casing and <br /> slotted screen <br /> r- _ Screen (0.020-inch slot size) will extend fr)m.30 feet to 15 feet bgs <br /> • <br /> .:A sand filter pack consisting of No. 3 Mo terey sand will be placed from..30;` <br /> feet to 13 feet bgs in the well annulus : <br /> • A bentonite seal will 'extend from 13 fe t to _11 feet bgs (the seal will be ' <br /> } made of hydrated bentoniteP ellets) , . <br /> • The remainder of.the well annulus will be filled with grout consisting of <br /> .neat cement or cement/bentonite grout with no more than 3 % bentonite <br /> D104 WP 9/95 4 <br /> F . <br />
The URL can be used to link to this page
Your browser does not support the video tag.