Laserfiche WebLink
J <br /> CLEARWA"E'R <br /> G R O U P, I q C. <br /> All wells will be surveyed to the north side of the top g of casing for elevations <br /> to the nearest ±0.01 foot. Elevations will lie referenced either to mean sea <br /> level or to a project datum. A project datum is -typically chosen for its <br /> location such that it will remain unchanged in the event of site construction <br /> or other site disturbances.. Where required, the wells will be surveyed by a <br /> licensed land surveyor, relative to the neare t benchmark. <br /> . Well Development <br /> All newly installed wells will be developed prior to sampling to remove fine . <br /> grained sediments from the well and stabilize the filter pack and the disturbed <br /> aquifer materials. Welldevelopment will consist of surging .with a surge <br /> block and removing water from the well With either a pump or bailer, until-. <br /> the well is free of sediment, or after, 14 ell casing volumes have been <br /> F`y removed. Where appropriate, temperature,- pH, specific conductance and <br /> turbidity will be monitored during well development. All development <br /> equipment will be cleaned prior to use-and between wells with an Alconox <br /> solution, thenrinsed in clean water. All data collected during development. <br /> _ will be presented on the well development data sheet. <br /> I <br /> i <br /> Ground Water Sampling <br /> Prior to the start of work, a decontamination area will be established. This <br />� will be in a secured area and consist of an Alconox solution wash, a first rinse <br /> M' } and a second rinse. Any down hole equipment will be decontaminated prior <br /> to use. <br /> j <br /> } Prior to purging and sampling any well the static water level will be <br /> measured with an electronic water sounder r an oil/water interface probe to <br /> the nearest ±0.41 foot. If floating product is detected, interface probe results <br /> will be confirmed by lowering a clear disposable polyethylene bailer down the <br /> well and measuring the product thickness to the nearest ±0.01 foot, in the <br /> bailer. . Any monitoring well containing detectable amounts of floating <br /> product will not be purged or sampled. Field observations such as well <br /> integrity as well as water level measurements and floating product <br /> thicknesses will be noted on the gauging data/purge calculations form. <br /> j <br /> All monitoring wells to be sampled shall be purged using either a PVC bailer <br /> or a 'submersible pump. Physical par meters (pH, temperature and <br /> conductivity) of the purge water-will be monitored for stabilization during <br /> 3 <br /> CLEARWA=R GROUP,INC. lune 2,1995 <br /> r-+ <br /> p <br />