Laserfiche WebLink
Ij <br /> I..0 PURPOSE <br /> This Site Safety Plan (SSP) establishes the basic safety guidelines and requirements for <br /> the above scope(s) of work at the above site (see Site Location Map -Figure 1). This SSP <br /> addresses the expected potential hazards that maybe encountered during this project. <br /> r <br /> The provisions set-forth in this SSP I�will apply to Clearwater Group, Inc. (Clearwater) <br /> employees and any subcontractors working for Clearwater at the job site. All personnel <br /> working for Clearwater, including subcontractors, at the job site must read this SSP, and . <br /> sign the attached Compliance Agreement (Appendix A) before entering the work area. <br /> 2-0 FACILITY BACKGROUND <br /> 2.1 Site Layout and History (Site location is shown on Fig. 1, site map on Fig: 2) <br /> _ Previous Site Operations: r{-Jo, curd From: - To: <br /> k 4 <br /> ri <br /> From: To: <br /> A{ <br /> Is site currently active? Yes No <br /> Work surface is: Asphalt Concrete. Gravel/Dirt <br /> ASTs/USTs present?: Yes No Location: <br /> Number of USTs removed: Z Location: Date removed: 3 g� <br /> 4-. 2? Soil Contamination <br /> Maximum benzene concentration in soil: i.ocation: <br /> Maximum TPH concentration in soil: +E �.� Location: . <br /> F <br /> 2.3 Ground Water Wells and Contamination <br /> 4 <br /> Number of monitoring wells at the site: <br /> 6/a _ <br /> Maximum dissolved benzene concentration to date: ��' Well: <br /> Latest maximum dissolved benzene concentration: ALL: Well: <br /> F <br /> r <br /> 2.4 Remediation <br /> ! ` Previous remedial system operation: From To: <br /> Front To: <br /> 7 Active remediation: IVaV_ e_ <br /> Number of SVE wells: AS wells: GWE wells: <br /> Other (trenches, sumps,._): <br /> Remediation equipment on site: <br /> � 1 <br /> E . ti <br />