My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
V
>
VERA
>
1210
>
3500 - Local Oversight Program
>
PR0545792
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2020 2:43:11 PM
Creation date
6/15/2020 2:38:20 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0545792
PE
3528
FACILITY_ID
FA0009410
FACILITY_NAME
RIPON PW WELLS (CORP YARD)
STREET_NUMBER
1210
Direction
S
STREET_NAME
VERA
STREET_TYPE
AVE
City
RIPON
Zip
95366
APN
25933004
CURRENT_STATUS
02
SITE_LOCATION
1210 S VERA AVE
P_DISTRICT
005
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CLEARWATER <br /> G R O U P, I N C. <br /> February 9, 1995 <br /> Mr. Ron Rowe <br /> San Joaquin County <br /> PHS/EHD <br /> 446 N. San Joaquin St. <br /> Stockton, CA 95201-388 <br /> Re: 300 South California St., Stockton, CA and 1210 Vera St., Ripon, CA <br /> Dear Ron, <br /> I'm glad we had a chance to talk today regarding the workplans for well <br /> installation at the above referenced site. Enclosed you will find completed <br /> applications for well installation at each location. I attached a site plan for <br /> each location rather than drawing a to scale plot plan. After installation, all <br /> wells will be surveyed. At that time a to scale map can be made of the entire <br /> property. In the interest of time and money, I hope this is acceptable. <br /> After our conversation today, I spoke with Brooke Birkie at Neurniller <br /> Beardslee about your concerns for the overall condition of the site. She will <br /> be speaking to the property owner about de ling with the "above ground" <br /> practices and current condition especially in the tank pit. <br /> I would like to schedule drilling for the site it Ripon on February 23, 1995. If <br /> tills is possible, please let me know as soon s you can. Also, keep in mind <br /> that I will be on vacation from February 12th to the 21st. Markus Niebanck <br /> will, be managing my projects while I am away. If you need to contact him <br /> regarding drilling in Ripon on the 23rd, he can be reached at 510-337-8:'32. <br /> I look forward to working with you on thesE projects.. Please call me if you <br /> should have any questions or comments. <br /> Sincerely, <br /> CLEARWA'I'ER GROUP, EVC. <br /> Juniper Neill <br /> Project Manager <br /> CC. Brooke K. Birkie <br /> Neumiller & Beardslee <br /> 1125 Atlantic Avenue•Suite 102 •Alameda •California • 94501 • (510)337-8730 •Fax(510)523-0984 <br />
The URL can be used to link to this page
Your browser does not support the video tag.