Laserfiche WebLink
r <br /> 1.0 PURPOSE <br /> This Site Safety Plan (SSP) establishes the basic safety guidelines and requirements for <br /> the above scope(s) of work at the above site (see Site Location Map - Figure 1). This SSP <br /> addresses the expected potential hazards that May be encountered during this project. <br /> The provisions set-forth in this SSP will apply to Clearwater Group, Inc. (Clearwater) <br /> employees and any subcontractors working for learwater at the job site. All personnel <br /> working for Clearwater, including subcontractors, at the job site must read this SSP, and <br /> sign the attached Compliance Agreement (Appe dix A) before entering the work area. <br /> 2.0 FACILITY BACKGROUND <br /> 2.1 Site Layout and History (Site location is shown on Fig. 1, site map on Fig. 2) <br /> Previous Site Operations: From: To: <br /> From: To: <br /> Is site currently active? S No <br /> Work surface is: Asphalt Concrete Grave /Dirt <br /> ASTs/USTs present?: Yes No Location: <br /> Number of USTs removed: 2 Location: Date removed: 3 90 <br /> 2.2 Soil Contamination r <br /> h <br /> Maximum benzene concentration in soil: - �IQh'�1 %.ocatioi�:., G �_ <br /> f - <br /> Maximum TPH concentration in soil: 67,969P0,11 Location: b 11"­5 <br /> 2.3 Ground Water Wells and Contamination <br /> Number of monitoring wells at the site: D <br /> Maximum dissolved benzene concentration to ate: IJ X4 Well: <br /> Latest maximum dissolved benzene concentration: __AV Well: <br /> 2.4 Remediation <br /> Previous remedial system operation: From To: <br /> From To: <br /> Active remediation: Non.L <br /> Number of SVE wells: AS wells: GWE wells: <br /> Other (trenches, sumps,._): <br /> Remediation equipment on site: <br />