Laserfiche WebLink
mw <br /> PAR <br /> Mg <br /> Mr.Greg Lyon 2021899-7004 <br /> October 18, 1990 PaUe 2 <br /> The hand auger,impact sampler and brass tubes will be washed with detergent and rinsed with distilled <br /> water prior to each sampling effort. Each auger hole will be backfilled with native material generated from <br /> that hole. No paving will be needed because the holes will be located in unpaved zfeas. <br /> EHD will be notified 48 hours prior to the soil-sampling activities. It Is estimated that the field activities will <br /> take approximately 3 hours to complete. Groundwater Technology is prepared to completo these work <br /> steps as soon as this work plan is approved by EHD. <br /> Please call our West Sacramento office if you have any questions or require additional informallon <br /> regarding this work plan. <br /> Sincerely, <br /> GROUNDWATER TECHNOLOGY, INC. <br /> ED K.SIMCNIS <br /> California Registered <br /> Geologist No.4422 <br /> ROBERT H. BIRD <br /> Senior Scientist <br /> project Manager <br /> i_KSIRHB:rc <br /> cc: Mr.Kenneth Olds <br /> Lammersville School District <br /> 16555 West Von Sosten Road <br /> Tracy, CA <br /> S GROUNIAVATER <br /> TEC11"'OL 1Gy.'SNC. <br />