My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PINE
>
845
>
2200 - Hazardous Waste Program
>
PR0507085
>
COMPLIANCE INFO_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2020 12:18:49 PM
Creation date
6/15/2020 4:04:57 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
2019
RECORD_ID
PR0507085
PE
2227
FACILITY_ID
FA0004925
FACILITY_NAME
Caltrans-Lodi
STREET_NUMBER
845
Direction
E
STREET_NAME
PINE
STREET_TYPE
St
City
Lodi
Zip
95240
CURRENT_STATUS
01
SITE_LOCATION
845 E Pine St
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
543
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATE OF CALIFORNIA•DEPARTMENT OF TRANSPORTATION <br /> BMP TAILGATE MEETING REPORT <br /> NPDE-S0001 (REV 10/2017) <br /> ACTION AND DISTRIBUTION: <br /> 1. First line supervisor conducts meeting, completes, and signs form <br /> 2. First line supervisor retains and posts a copy <br /> 3. First line supervisor forwards a copy to second line supervisor for review and signature <br /> 4. Second line supervisor signs and returns the copy to first line supervisor to file in FPPP binder and forwards the copy to the <br /> Maintenance Storm Water Coordinator <br /> REGION OFFICE/YARD <br /> Stockton Lodi <br /> DATE OF MEETING COST CENTER <br /> 12/03/2018 632 <br /> ATTENDANCE: <br /> Employee Name(Print) loyee Signa re Employee Name(Print) Employee Signature <br /> Clint mansfield Robert Brenner <br /> Joseph Villarreal Joseph Bustos <br /> BMPs Discussed(List): <br /> Covering Storm Drains. <br /> Ej Other <br /> Suggestions for'BMP Improvements <br /> Cover all nearby storm drains while Grinding,Painting,and applying Thermoplastic markings. Sweep up all grindings and glass beads after <br /> completing work to prevent debris fi•om entering the drainage system.Also,sweep up any debris that may have built up in gore points near <br /> Limit Lines and Legends. <br /> Supervisor's Comments <br /> Only Rain Down The Drain. <br /> FIRST LINE SUPERVISOR(Print) SECQND 41NE�SUP"ERVISOR (Print) <br /> Billy Dilly oaf—( Le--41 C7 <br /> FIRST LINE SUPERVISOR(Signature) DATE SECON LINE SUPERVISOR(Signature) DATE <br /> 12/03/2018 �-- <br /> 4rd � �2_ rd <br /> Fo ompl -ed copy to the District Maintenance Storm Water coordinator Post completed copy in crew room or FPPP book, <br /> keep copies for minimum of three(3)years. <br /> ADA Notice For individuals with sensory disabilities, this document is available in alternate formats. For alternate formal information, contact the Forms <br /> Management Unit at(916)445-1233,TTY 711 or write to Records and Forms.Management, 1120 N Street, MS-89,Sacramento,CA 95814. <br />
The URL can be used to link to this page
Your browser does not support the video tag.