Laserfiche WebLink
11 <br /> accordance with the Engineers'design. The drilling and reaming of the borehole will be conducted <br /> by the direct rotary drilling method to the depth and diameter specified in the Engineers <br /> design. Drilling fluid properties must conform to those specified in Section 2.1.3. <br /> B. Methods--The test hole shall be reamed to a minimum diameter and depth as specified in the <br /> Engineers design. The Contractor shall be responsible to protect the pilot hole from caving. The <br /> Contractor shall exercise caution to ensure that the hole remains straight and plumb during the <br /> reaming operations. <br /> 2.3.5 WELL CASING AND SCREEN <br /> A. Scope -- This item shall consist of furnishing and installing blank casing and well screen as <br /> specified in the Engineers'final design. <br /> B. Methods <br /> 1.A wiper trip shall be conducted to insure that the borehole is open to the total depth prior <br /> to running casing. <br /> 2. A tremie pipe of a minimum two-inch diameter shall be run into the borehole to the total <br /> depth of the casing installation. Circulation by pumping shall be established using fluid <br /> from the drilling fluid/mud tank of the same viscosity as that in the borehole. Circulation <br /> shall continue for a period of thirty minutes prior to casing installation. <br /> 3. With the tremie pipe remaining in the borehole, casing installation shall proceed in <br /> accordance with the final well design for casing installation furnished by the Engineer. <br /> 4. The casing assemblies shall be installed to the specified depth supported above the <br /> ground surface. The casing shall be capped to ensure that foreign particles are prevented <br /> from entering the casing. <br /> 5. The casing shall be suspended in tension from the surface by means of an appropriate <br /> hanger or clamp. The bottom of the casing shall be at a sufficient distance above the <br /> bottom of the reamed hole to ensure that none of the casing will be supported from the <br /> bottom of the hole. <br /> 6. Circulation through the tremie pipe shall continue during the casing installation. <br /> 7. If, for any reason, the casing cannot be landed in the correct position or at a depth <br /> acceptable to the Engineer, the Contractor shall remove the casing, recondition the <br /> borehole and reinstall the casing to the specified depth. If the casing cannot be removed <br /> from the borehole the contractor shall construct another well immediately adjacent to the <br /> original location and complete the well in accordance with these Technical Provisions at <br /> no additional cost to the Owner. The abandoned hole shall be sealed in accordance with <br /> these Technical Provisions and in accordance with any laws pertaining to proper well <br /> abandonment at no additional cost to the Engineer. <br /> 8. If any of the casing assembles collapse prior to well completion,the remaining hole shall <br /> be abandoned in accordance with these Technical Provisions at no cost to the Owner. A <br /> replacement borehole and well shall be drilled and constructed at an adjacent location as <br /> directed by the Engineer. <br />