My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2020
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
6633
>
2300 - Underground Storage Tank Program
>
PR0231784
>
COMPLIANCE INFO_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2021 9:49:40 AM
Creation date
6/16/2020 3:57:10 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2020
RECORD_ID
PR0231784
PE
2361
FACILITY_ID
FA0003834
FACILITY_NAME
PACIFIC AVE CHEVRON
STREET_NUMBER
6633
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
APN
097-410-48
CURRENT_STATUS
01
SITE_LOCATION
6633 PACIFIC AVE
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
82
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The following is an itemized list of underground storage tank violations that have not <br />been addressed for PACIFIC AVE CHEVRON as of April28, 2020. <br />Open violations from January 21, 2020 inspection <br />Violation #121 - Failure to implement corrections and submit written response within 30 days of receiving <br />the report. <br />OBSERVATION An inspection was last done on 01/29/2019 and an inspection report was issued identifying <br />information to be submitted to bring this site into compliance. This information was required to be submitted by <br />[February 18, 2019 . This information has not been received resulting in a non-compliant status for this facility. <br />REGULATION GUIDANCE: An operator that receives an inspection report shall have 30 days to implement the <br />corrections specified in the inspection report and comply with permit conditions. The corrective action shall include <br />all of the recommendations made in the report. The operator shall submit a written response that includes a <br />statement documenting corrective actions taken or proposing corrective actions which will be taken. <br />CORRECTIVE ACTION: Ensure that a written response documenting corrective actions taken or proposed is <br />submitted and all corrections implemented within 30 days of receiving an inspection report. <br />❑ This violation was corrected ❑ This violation will be corrected by (date): <br />❑ Supporting documents included <br />Describe actions taken or will be taken to correct violation: <br />Violation #201 - Failure to maintain monitoring, maintenance, and follow up action records. <br />OBSERVATION Maintenance and monitoring records for the last three years were not found on site <br />- 2017 and 2019 Monitoring certification test results <br />- Overfill prevention test results conducted on 10/12/2018 <br />REGULATION GUIDANCE: These records shall be maintained on site for at least three years. Monitoring records <br />include: (1) date and time of all monitoring or sampling; (2) monitoring equipment calibration and maintenance <br />records; (3) results of any visual observations; (4) results of sample analysis performed a lab or in the field; (5) logs <br />of all readings of gauges or other monitoring equipment, ground water elevations, or other test results; (6) results of <br />inventory readings and reconciliations. <br />CORRECTIVE ACTION: Immediately locate and maintain all missing maintenance and monitoring records for the <br />last three years on site and submit copies to the EHD. <br />❑ This violation was corrected ❑ This violation will be corrected by (date): <br />❑ Supporting documents included <br />Describe actions taken or will be taken to correct violation: <br />Page 1 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.