Laserfiche WebLink
SWRCB,January 2002 <br /> XV. TURBINE/PRODUCT PIPING SUMP TESTING INFORMATION <br /> Test Method Developed By: ❑Sump Manufacturer 0 Industry Standard ❑Professional Engineer <br /> ❑Other(Spec) <br /> Test Method Used: ❑Pressure Vacuum 0 Hydrostatic <br /> ❑Other(Spec) <br /> Test Equipment Used:Incon Equipment Resolution:0.002" <br /> Sump#91 Sump#Diesel Sump#87 Sump# <br /> Sump Diameter: 36" 36" 36" <br /> Sump Depth: 56" 56" 56" <br /> Sump Material: Fiberglass Fiberglass Fiberglass <br /> Height from Tank Top to Top of 10" 10" 10" <br /> Highest Piping Penetration: <br /> Height from Tank Top to Lowest <br /> 23" 23" 23" <br /> Electrical Penetration: <br /> Condition of sump prior to testing: Clean and dry Clean and dry Clean and dry <br /> Portion of Sump Tested' 14" 14" 14" <br /> Does turbine shut down when ❑Yes ❑No 0 NA <br /> sump sensor detects liquid(both ❑Yes O No 2 NA ❑Yes ❑No R1 NA ❑Yes ❑No [INA <br /> product and water)?* <br /> Turbine shutdown response time N/A N/A N/A N/A <br /> Is system programmed for fail-safe ❑Yes ❑No ❑NA ❑Yes O No 0 NA ❑Yes O No 0 NA ❑Yes ❑No ❑NA <br /> shutdown?* <br /> Was fail-safe verified to be ❑Yes ❑No Z NA ❑Yes O No 0 NA ❑Yes ❑No 0 NA ❑Yes ❑No ❑NA <br /> operational?* <br /> Wait time between applying <br /> pressure/vacuum/water and starting 30 minutes 30 minutes 30 minutes <br /> test: <br /> Test Start Time: 11:35 AM 12:18 PM 10:52 AM <br /> Initial Reading(RI): 1.374" 2.694" 1.288" <br /> Test End Time: 11:50 AM 12:33 PM 11:07 AM <br /> Final Reading(RF): 1.374" 2.695" 1.266" <br /> Test Duration: 15 minutes 15 minutes 15 minutes <br /> Change in Reading(RF-RI): 0.000" 0.001" 0.000" <br /> Pass/Fail Threshold or Criteria: 0.002" 0.002" 0.002" <br /> Test Result: 0 Pass ❑Fail Z Pass ❑Fail Z Pass ❑Fail ❑ Pass O Fail <br /> Was sensor removed for testing? Yes ❑No ❑NA Z Yes ❑No "u NA Ln Yes ❑No ❑NA ❑Yes ❑No Li NA <br /> Was sensor properly replaced and D, Yes ❑No ❑NA 2 Yes ❑No ❑NA 0 Yes O No ❑NA ❑Yes ❑No ❑NA <br /> verified functional after testing? <br /> Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> IUI 2020 <br /> ENVIRONMENTAL HEALTH <br /> DEPARTMENT <br /> 'If the entire depth of the sump is not tested,specify how much was tested. If the answer to Many of the questions indicated with an <br /> asterisk(*)is"NO"or"NA",the entire sump must be tested. (See SWRCB LG-160) <br />