My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2020
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PERSHING
>
4445
>
2300 - Underground Storage Tank Program
>
PR0231785
>
COMPLIANCE INFO_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/15/2020 2:38:49 PM
Creation date
6/16/2020 4:22:41 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2020
RECORD_ID
PR0231785
PE
2361
FACILITY_ID
FA0003994
FACILITY_NAME
PERSHING GAS FOR LESS
STREET_NUMBER
4445
Direction
N
STREET_NAME
PERSHING
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
APN
11018006
CURRENT_STATUS
01
SITE_LOCATION
4445 N PERSHING AVE
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
152
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB,January 2002 <br /> XXI. UNDER-DISPENSER CONTAINMENT TESTING INFORMATION <br /> Test Method Developed By: ❑UDC Manufacturer 2 Industry Standard ❑Professional Engineer <br /> ❑Other(Spec) <br /> Test Method Used: ❑Pressure ❑Vacuum 0 Hydrostatic <br /> ❑Other(Spec) <br /> Test Equipment Used:IC1C011 Equipment Resolution:0.002" <br /> UDC#12 UDC#3-4 UDC#5-6 UDC#7-8 <br /> UDC Manufacturer: Unknown Unknown Unknown Unknown <br /> UDC Material: Fiberglass Fiberglass Fiberglass Fiberglass <br /> UDC Depth: 30" 30" 30" 30" <br /> Height from UDC Bottom to Top 12" 12" 12" 12" <br /> of Highest Piping Penetration: <br /> Height from UDC Bottom to N/A N/A N/A N/A <br /> Lowest Electrical Penetration: <br /> Condition of UDC prior to Clean and dry Clean and dry Clean and dry Clean and dry <br /> testing: <br /> Portion of UDC Tested 16" 16" 16" 16" <br /> Does turbine shut down when Yes ❑No 2 NA <br /> UDC sensor detects liquid(both ❑Yes ❑No 0 NA 2 Yes ❑No 2 NA ❑Yes ❑No 2 NA <br /> product and water)?* <br /> Turbine shutdown response time N/A N/A N/A N/A <br /> Is system programmed for fail- ❑Yes ❑No 2 NA <br /> safe shutdown?4 ❑Yes ❑No 2 NA ❑Yes ❑No C;NA ❑Yes ❑No ,NA <br /> Was fail-safe verified to be ]Yes ❑No 0 NA ❑Yes ❑No 0 NA ❑Yes ❑No 2 NA ❑Yes ❑No 2 NA <br /> operational?* <br /> Wait time between applying <br /> pressure/vacuum/water and 30 minutes 30 minutes 30 minutes 30 minutes <br /> starting test <br /> Test Start Time: 11:35 AM 11:13 AM 10:30 AM 10:30 AM <br /> Initial Reading (RI): 4.688" 4.834" 4.459" 3.297" <br /> Test End Time: 11:50 AM 11:28 AM 10:45 AM 10:45 AM <br /> Final Reading(RF): 4.688" 4.835" 4.458" 3.296" <br /> Test Duration: 15 minutes 15 minutes 15 minutes 15 minutes <br /> Change in Reading RF-RI : 0.000" 0.001" 0.001" 0.001" <br /> Pass/Fail Threshold or Criteria: 0.002" 0.02" 0.002" 0.002" <br /> Test Result: Z Pass ❑Fail 2 Pass ❑Fail 9 Pass ❑Fail Z Pass ❑Fail <br /> Was sensor removed for testing? vI Yes I No ❑NA 2 Yes ❑No ❑NA 2 Yes ❑No ❑NA 2 Yes ❑No ❑NA <br /> Was sensor properly replaced and Lvi Yes ❑No ❑NA 2 Yes ❑No ❑NA 2 Yes ❑No ❑NA 2 Yes ❑No ❑NA <br /> verified functional after testing? <br /> Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> 'If the entire depth of the UDC is not tested,specify how much was tested. If the answer to any of the questions indicated with an <br /> asterisk(*)is"NO"or"NA",the entire UDC must be tested. (See SWRCB LG-160) <br />
The URL can be used to link to this page
Your browser does not support the video tag.