My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2020
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PERSHING
>
4445
>
2300 - Underground Storage Tank Program
>
PR0231785
>
COMPLIANCE INFO_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/15/2020 2:38:49 PM
Creation date
6/16/2020 4:22:41 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2020
RECORD_ID
PR0231785
PE
2361
FACILITY_ID
FA0003994
FACILITY_NAME
PERSHING GAS FOR LESS
STREET_NUMBER
4445
Direction
N
STREET_NAME
PERSHING
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
APN
11018006
CURRENT_STATUS
01
SITE_LOCATION
4445 N PERSHING AVE
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
152
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
n <br /> The following is an itemized list of underground storage tank violations that have not <br /> been addressed for PERSHING GAS FOR LESS as of April28 , 2020 . <br /> Open violations from January 21, 2020 inspection <br /> EJ'�This violation was corrected ❑ This violation will be corrected by (date) : <br /> ❑ Supporting documents included <br /> Describe actions taken or will betaken to correct violation : U nt6A ) ) tD) 0 N QL- 2S' oln >> Y ILL <br /> Violation #121 - Failure to implement corrections and submit written response within 30 days of receiving <br /> the report, <br /> OBSERVATION An inspection was last done on 01 /15/2019 and an inspection report was issued identifying <br /> information to be submitted to bring this site into compliance. This information was required to be submitted by <br /> 02/14/2019 . This information has not been received resulting in a non-compliant status for this facility. <br /> REGULATION GUIDANCE: An operator that receives an inspection report shall have 30 days to implement the <br /> corrections specified in the inspection report and comply with permit conditions . The corrective action shall include <br /> all of the recommendations made in the report. The operator shall submit a written response that includes a <br /> statement documenting corrective actions taken or proposing corrective actions which will be taken . <br /> CORRECTIVE ACTION : Ensure that a written response documenting corrective actions taken or proposed is <br /> submitted and all corrections implemented within 30 days of receiving an inspection report. <br /> EY�This violation was corrected ❑ This violation will be corrected by ( date) : <br /> ❑ Supporting documents included <br /> Describe actions taken or will betaken to correct violation : T) y e. ) L Cev , � 6 <br /> /) 1 oto ll M7 Atltw t) 0o dk vTo I RlM SVM f 4/�9) /)Jfv2t_ 7 V <br /> t i INaN 'i k1l /mn e: V . <br /> Violation #204 - Current monitoring plan approved by the EHD not found on site, <br /> OBSERVATION An approved copy of the monitoring plans were not available for inspection . <br /> REGULATION GUIDANCE: A copy of these plans shall be accessible on site at all times . <br /> CORRECTIVE ACTION: Immediately locate and retain a copy on site . <br /> ❑This violation was corrected ❑ This violation will be corrected by ( date) : <br /> ❑ Supporting documents included n <br /> Describe actions taken or will betaken to correct violation : /'1UN 11 U /1rw�' d 'LAni anyo ,y3 y C /O t <br /> o1-4 GItc ON StiL. <br /> Page 2 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.