My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2020
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PERSHING
>
4445
>
2300 - Underground Storage Tank Program
>
PR0231785
>
COMPLIANCE INFO_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/15/2020 2:38:49 PM
Creation date
6/16/2020 4:22:41 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2020
RECORD_ID
PR0231785
PE
2361
FACILITY_ID
FA0003994
FACILITY_NAME
PERSHING GAS FOR LESS
STREET_NUMBER
4445
Direction
N
STREET_NAME
PERSHING
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
APN
11018006
CURRENT_STATUS
01
SITE_LOCATION
4445 N PERSHING AVE
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
152
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB,January 2002 <br /> VII. PRODUCT PIPING CONTAINMENT TESTING INFORMATION <br /> Test Method Developed By: ❑Piping Manufacturer Industry Standard ❑Professional Engineer <br /> ❑Other(Spec) <br /> Test Method Used: 0 Pressure Vacuum ❑Hydrostatic <br /> ❑Other(Spec) <br /> Test Equipment Used:Precision mechanical test gauge Equipment Resolution:0.0625" <br /> AMPiping Run#91 Piping Run#Diesel Piping Run#87 Piping Run# <br /> Piping Material: Fiberglass Fiberglass Fiberglass <br /> Piping Manufacturer: Smith Smith Smith <br /> Piping Diameter: 3.5" 3.5" 3.5' <br /> Length of Piping Run: Unknown Unknown Unknown <br /> Product Stored: Gasoline Diesel Gasoline <br /> Method and location of piping-run isolation: soot in UDC soot in UDC Boot in UDC <br /> Wait time between applying <br /> pressure/vacuum/water and 30 minutes 30 minutes 30 minutes <br /> starting test: <br /> Test Start Time: 9:45 am 9:45 am 9:45 am <br /> Initial Reading(RI): 5 psi 5 psi 5 psi <br /> Test End Time. 10:45 am 10:45 am 10:45 am <br /> Final Reading(RF): 5 psi 5 psi 5 psi <br /> Test Duration: 60 minutes 60 minutes 60 minutes <br /> Change in Reading(RF-RI): 0.00" 0.00" 0.00" <br /> Pass/Fail Threshold or 0.00" 0.00" 0.00" <br /> Criteria: <br /> Test Result: 0 Pass ❑Fail © Pass ❑Fail I] Pass ❑Fail ❑ Pass ❑Fail <br /> Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />
The URL can be used to link to this page
Your browser does not support the video tag.