My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2020
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PERSHING
>
4445
>
2300 - Underground Storage Tank Program
>
PR0231785
>
COMPLIANCE INFO_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/15/2020 2:38:49 PM
Creation date
6/16/2020 4:22:41 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2020
RECORD_ID
PR0231785
PE
2361
FACILITY_ID
FA0003994
FACILITY_NAME
PERSHING GAS FOR LESS
STREET_NUMBER
4445
Direction
N
STREET_NAME
PERSHING
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
APN
11018006
CURRENT_STATUS
01
SITE_LOCATION
4445 N PERSHING AVE
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
152
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB,January 2002 <br /> XV. TURBINE/PRODUCT PIPING SUMP TESTING INFORMATION <br /> Test Method Developed By: ❑Sump Manufacturer A Industry Standard ❑Professional Engineer <br /> ❑Other(Spec) <br /> Test Method Used: ❑Pressure ❑Vacuum Z Hydrostatic <br /> ❑Other(Spec) <br /> i <br /> st Equipment Used:Incon Equipment Resolution:0.002" <br /> Sump#91 Sump#Diesel Sump#87 Sump# <br /> Sump Diameter: 36" 36" 36" <br /> Sump Depth: 56" 56" 56" <br /> Sump Material: Fiberglass Fiberglass Fiberglass <br /> Height from Tank Top to Top of 10" 10" 10" <br /> Highest Piping Penetration: <br /> Height from Tank Top to Lowest 23" 23" 23" <br /> Electrical Penetration: <br /> Condition of sump prior to testing: Clean and dry Clean and dry Clean and dry <br /> Portion of Sump Tested' 14" 14" 14" <br /> Does turbine shut down when i i Yes ❑No Z NA <br /> sump sensor detects liquid(both ❑Yes ❑No 0 NA ❑Yes ❑No 0 NA ❑Yes ❑No ❑NA <br /> product and water)?. <br /> Turbine shutdown response time N/A N/A N/A N/A <br /> is system programmed for fail-safe ❑Yes ❑No Z NA ❑Yes ❑No 0 NA ❑Yes ❑No RJ NA ❑Yes ❑No CNA <br /> shutdown? <br /> Was fail-safe verified to be ❑Yes ❑No 0 NA ❑Yes ❑No 0 NA ❑Yes ❑No 0 NA ❑Yes ❑No ❑NA <br /> operational?` <br /> Wait time between applying <br /> pressure/vacuum/water and starting 30 minutes 30 minutes 30 minutes <br /> test: <br /> Test Start Time: 11:35 AM 12:18 PM 10:52 AM <br /> Initial Reading(RI): 1.374" 2.694" 1.288" <br /> Test End Time. 11:50 AM 12:33 PM 11:07 AM <br /> Final Reading(RF): 1.374" 2.695" 1.288" <br /> Test Duration: 15 minutes 15 minutes 15 minutes <br /> Change in Reading(RF-RI): 0.000" 0.001" 0.000" <br /> Pass/Fail Threshold or Criteria: 0.002" 0.002" 0.002" <br /> Test Result: Pass ❑Fail Z Pass ❑Fail Z Pass ❑Fail ❑ Pass ❑Fail <br /> Was sensor removed for testing? Yes No ❑NA 0 Yes ❑No ❑NA 0 Yes ❑No L_j NA ❑Yes ❑No ❑NA <br /> Was sensor properly replaced and L Yes ❑No ❑NA Yes ❑No ❑NA Z Yes ❑No ❑NA El El No 11 NA <br /> verified functional after testing? <br /> Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> ' If the entire depth of the sump is not tested,specify how much was tested. If the answer to any of the questions indicated with an <br /> asterisk(*)is"NO"or"NA",the entire sump must be tested. (See SWRCB LG-160) <br />
The URL can be used to link to this page
Your browser does not support the video tag.