Laserfiche WebLink
Advanced <br /> GeoEnvironmental, Inc. <br /> 26 October 2000 - <br /> AGE-NC Project No. 98-0466 <br /> Ms. Carol Oz <br /> SAN JOAQUIN COUNTY PHS-EBD <br /> 304 East Weber Avenue, 3`d Floor <br /> Stockton, CA 95201 <br /> Subject: Phase H Site Assessment Report- Septic Leach Fields and Drainage Ditch <br /> American Moulding and Millwork Company <br /> 2801 North West Lane, Stockton, California <br /> Dear Ms. Oz: <br /> At the request of Mr. J. Patrick Hughes of American Moulding and Millwork Company,Advanced <br /> GeoEnvironmental, Inc. has prepared the enclosed report documen ' g soil and ground water <br /> sampling procedures and results for two septic tank leach field areas and a drainage ditch on the site <br /> referenced above. The sampling was in response to recommendations o a Phase I Site Assessment <br /> of the property performed in 1987 and an updated Phase I prepared in N[ach 2000. If you have any <br /> questions or comments,please contact our office at(209) 467-1006. <br /> Sincerely, <br /> Advanced GeoEnvironmental,Inc. <br /> Nuel C. Henderson, Jr. <br /> Senior Project Geologist <br /> California Registered Geologist No. 5837 <br /> Enclosure <br /> cc: Mr. J. Patrick Hughes, American Moulding and Millwork <br /> Mr. Glen Gallup, American Moulding and Millwork <br /> Ms. Wendy Cohen, CRWQCB-CVR, SLIC Unit <br /> 4005 North Wilson Way. Stockton.California 95205 <br /> Telephone (209)467-1006 FAX (209)467-1119 <br />