Laserfiche WebLink
�a <br /> ). H. KLEINFELDER & ASSOCIIOES <br /> 3 SCOPE OF WORK <br /> 3.1 OBJECTIVE <br /> The objective of this investigation is to evaluate possible contamination <br /> 1 at the following sites within the AM&M facility: (1) the penta solution <br /> dip tank, (2) the septic tank leach field, (3) the open area east of Ray <br /> Bond Building, (4) the open area north of the Millwork Building, (5) the <br /> open space west of the saw filing room, (6) the drain sump northwest of <br /> the 44 X 120 foot storage building, (7) the north storm pond and, (8) the <br /> water supply well west of the employee parking lot. <br /> ' 3.2 APPROACH <br /> We will collect thirteen soil samples from five boringi, take one sediment <br /> sample, and collect three water samples, two from a pond and one from a <br /> 1 well. Samples will be chemically analyzed for the mosL likely contaminant <br /> or contaminants. Table 1 lists the eight sites with a description of the <br /> proposed investigation, sample location, and chemi al analysis to be <br /> performed on each sample. <br /> 3.3 SOIL SAMPLING <br /> To investigate possible contamination from the most likely contaminant(s) <br /> 1 <br /> depending on prior use, soil samples will be collected for chemical <br /> analysis and lithologic logging. A site map showing actual sampling <br /> locations will be prepared later in the field. Sample location will be <br /> approximately as described in Table 1. Five borings are planned with <br /> additional borings possible depending on condition noted in the field. <br /> One sediment sample will also be collected. <br /> 46-87-282 4 <br />