My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WEST
>
2801
>
2900 - Site Mitigation Program
>
PR0009016
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/17/2020 1:25:11 PM
Creation date
6/17/2020 11:32:10 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0009016
PE
2959
FACILITY_ID
FA0004032
FACILITY_NAME
AMERICAN MOULDING & MILLWORK (FRMR)
STREET_NUMBER
2801
STREET_NAME
WEST
STREET_TYPE
LN
City
STOCKTON
Zip
95204
APN
11709001
CURRENT_STATUS
01
SITE_LOCATION
2801 WEST LN
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
274
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
( LL Nunr.�nLLI VLR LALH FACILI <br /> FACI L I TY <br /> i>BA • /j <br /> fa ADDRESS <br /> MAILING ADDRESS <br /> I. Operating Permit Application/Annual Inspection Fee <br /> a. First Tank at Facility @ $150. <br /> b. Additional. Tanks (M Additional Tanks x $50) <br /> 2. State Surcharge (per tank) (Due with Permit Application, <br /> on renewal or amendment of operation permit and temporary closure) <br /> ($.56 x Total N Tanks) <br /> 3. "Temporary Closure (per tank) Underground Storage Tank in which <br /> storage has ceased but where the owner/operator proposes to <br /> re-use tank within 2 years. <br /> (#_ Temporary closures x $80) (See above /3 to.calculate surcharge) <br /> 4. `Permanent Closure (per tank) Underground Storage Tank in which <br /> _storage,-has .ceased,'and where the owner/operator has no intent <br /> of re-using tank. <br /> (l �—?- Permanent Closures x $90) c <br /> 5. Plan Check Fee $30. <br /> Total Number of Tanks �((!� Total Fee Due <br /> Make all fees payable to San Joaquin Local Health District. Enclose this worksheet �1 <br /> with your check . I j <br /> EXAMPLE - Annual Fee for Facility with 4 Tanks <br /> ( 1 regular, 1 unleaded, 1 supreme, I waste oil ) <br /> la. Existing Facility b 1st Tank 5150 <br /> b. 3 Additional Tanks x $50 150 <br /> 2. State Surcharge, 4 Tanks x $56 224 <br /> Total Number of Tanks 4 Total Fee Due $524 <br /> 'Doth closures will be conditioned. Contact a Health District Representative. <br /> 2-R6 <br /> UGC al <br />
The URL can be used to link to this page
Your browser does not support the video tag.