My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WEST
>
2801
>
2900 - Site Mitigation Program
>
PR0009016
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/17/2020 1:55:20 PM
Creation date
6/17/2020 11:34:01 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0009016
PE
2959
FACILITY_ID
FA0004032
FACILITY_NAME
AMERICAN MOULDING & MILLWORK (FRMR)
STREET_NUMBER
2801
STREET_NAME
WEST
STREET_TYPE
LN
City
STOCKTON
Zip
95204
APN
11709001
CURRENT_STATUS
01
SITE_LOCATION
2801 WEST LN
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
423
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 Appendix A <br /> • Project name and location <br /> • Date and time <br /> • Personnel in attendance <br /> • General weather information <br /> • Work performed <br /> • Field observations <br /> • Sampling performed, including specifics such as location,type of sample,type of analyses, and <br /> sample identification <br /> • Field analyses performed,including results,instrument checks,problems, and calibration records for <br /> field instruments <br /> • Descriptions of deviations from the FSP <br /> • Problems encountered and corrective action taken <br /> • Identification of field quality control(QC)samples <br /> • QC activities <br /> • Verbal or written instructions <br /> • Any other events that could affect the samples. <br /> A1.5.3.3 Document Corrections <br /> Changes or corrections on any project documentation will be made by crossing out the item with a single <br /> line, initialing(by the person performing the correction), and dating the correction. The original item, <br /> although erroneous,must remain legible beneath the cross-out.The new information should be written <br /> above the crossed-out item. Corrections must be written clearly and legibly ivith indelible ink_ <br /> KE61125 APPENDIX A MACTEC Engineering and Consulting, Inc. All <br /> September 28,2005 <br />
The URL can be used to link to this page
Your browser does not support the video tag.