Laserfiche WebLink
1 Appendix A <br /> • Project name and location <br /> • Date and time <br /> • Personnel in attendance <br /> • General weather information <br /> • Work performed <br /> • Field observations <br /> • Sampling performed, including specifics such as location,type of sample,type of analyses, and <br /> sample identification <br /> • Field analyses performed,including results,instrument checks,problems, and calibration records for <br /> field instruments <br /> • Descriptions of deviations from the FSP <br /> • Problems encountered and corrective action taken <br /> • Identification of field quality control(QC)samples <br /> • QC activities <br /> • Verbal or written instructions <br /> • Any other events that could affect the samples. <br /> A1.5.3.3 Document Corrections <br /> Changes or corrections on any project documentation will be made by crossing out the item with a single <br /> line, initialing(by the person performing the correction), and dating the correction. The original item, <br /> although erroneous,must remain legible beneath the cross-out.The new information should be written <br /> above the crossed-out item. Corrections must be written clearly and legibly ivith indelible ink_ <br /> KE61125 APPENDIX A MACTEC Engineering and Consulting, Inc. All <br /> September 28,2005 <br />