My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_MONITORING WELLS INSPECTIONS, REPAIR AND REDEVELOPMENT REPORT
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WASHINGTON
>
2201
>
2900 - Site Mitigation Program
>
PR0009227
>
ARCHIVED REPORTS_MONITORING WELLS INSPECTIONS, REPAIR AND REDEVELOPMENT REPORT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/17/2020 1:26:04 PM
Creation date
6/17/2020 1:21:29 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
MONITORING WELLS INSPECTIONS, REPAIR AND REDEVELOPMENT REPORT
RECORD_ID
PR0009227
PE
2960
FACILITY_ID
FA0004039
FACILITY_NAME
METROPOLITAN STEVEDORE
STREET_NUMBER
2201
Direction
W
STREET_NAME
WASHINGTON
City
STOCKTON
Zip
95203
APN
145030010
CURRENT_STATUS
01
SITE_LOCATION
2201 W WASHINGTON
P_LOCATION
01
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
93
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DAMES 6z MOORE APROFESSIONALLIMITED PARTNERSHIP <br /> 8801 FOLSOM BLVD., SUITE 200, SACRAMENTO, CA 95826 (916) 387-8800 <br /> j FAX NO. (916)387-0802 <br /> December 20, 1991 <br /> I <br /> Metropolitan Stevedore <br /> 720 East E Street <br /> Wilmington, CA 90748 <br /> `l Attention: Mr. Al Garnier <br /> J Re: Baseline Investigation Report <br /> Delta Bulk Terminals Facility <br /> 1 Parcel III <br /> J Port of Stockton, California <br /> Project No 12650-009-044 <br /> JDear Mr. Garnier: <br /> Enclosed please find five copies of the above referenced report. This report was prepared under <br /> the terms and conditions described in Dames & Moore's May 10, 1991 Phase II Site Investigation <br /> proposal. Included in this report is a discussion of the scope of services performed, site geologic and <br /> hydrogeologic conditions,procedures used during the investigation,findings of the investigation, and our <br /> conclusions and recommendations. <br /> As requested by Metropolitan Stevedore, separate reports have been prepared for Parcels I and <br /> II collectively, and for Parcel III individually. As some of the discussion in the reports is common to <br /> all three Parcels, some of the text is identical in each of the reports. <br /> If you have any questions or comments regarding this report, please contact either of the <br /> undersigned at 916/387-8800 <br /> Sincerely, <br /> DAMES & MOORE <br /> Kevin J. Brown <br /> Project Manager <br /> William R. Short, CEG <br /> Senior Geologist <br /> I_ December20, 1991 <br /> SAC28.013 <br /> OFFICE5 WORLDWIDE <br />
The URL can be used to link to this page
Your browser does not support the video tag.