Laserfiche WebLink
Marley Cooling Tower Company -3- 22 July 1986 <br /> (Mitigation Activities Work Plan) <br /> Mitigation Plan (contd. ) <br /> A suggested outline for developing the work plan for remaining activities at <br /> the MCTC site was transmitted in a letter from DHS to MCTC dated 27 May 1986. <br /> This outline was developed based on the requirements of DHS, EPA, and the <br /> Board. If a revised work plan is developed which follows this outline, then <br /> it is anticipated that the Board's requirements should be adequately addressed. <br /> REF:mlm <br />