My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FIELD DOCUMENTS_1986
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WAGNER
>
200
>
2900 - Site Mitigation Program
>
PR0009002
>
FIELD DOCUMENTS_1986
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/17/2020 2:32:41 PM
Creation date
6/17/2020 1:27:14 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
FIELD DOCUMENTS
FileName_PostFix
1986
RECORD_ID
PR0009002
PE
2960
FACILITY_ID
FA0004040
FACILITY_NAME
SPX COOLING TECHNOLOGIES INC
STREET_NUMBER
200
Direction
N
STREET_NAME
WAGNER
STREET_TYPE
AVE
City
STOCKTON
Zip
95215
APN
14331007
CURRENT_STATUS
02
SITE_LOCATION
200 N WAGNER AVE
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
208
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
General Contruction - Contract No . 2 <br /> A contract has been signed with the <br /> Nomellini Construction Co . (NCC) of <br /> Stockton, CA. The work will consist of <br /> the installation of Owner-furnished <br /> storm water pump station , construction <br /> of storm water force main , flow equal- <br /> ization basin , pumps , liquid straining <br /> and filtration equipment , treatment <br /> plant building , two neutraliztion tanks , <br /> dilution water storage tanks , recovery <br /> tank, process pipe and valves , 12 inch <br /> outfall piping , and installation of <br /> Owner-furnished ion exchange water treat- <br /> ment equipment at the Marley Cooling <br /> Tower Company , Stockton , California <br /> facility . <br /> Construction will start immediately. <br /> Marley Pump Procurement - Contract No 3 <br /> Purchase order No . CE 52307 proj . 5-4320 <br /> was issued to Hydromatic Pumps - Marley <br /> Pump Co . , Mission, KS . Delivery is to be <br /> made Sept . 22 , 1986 . <br /> It is estimated that the IE system will be <br /> operable in Dec . , 1986 . <br /> Plans to fill the pond have been made and <br /> discussed with all agencies involved . <br /> Changes suggested by the Regulatory Agencies , <br /> are being investigated. <br /> Mitigation Plan <br /> Black and Veatch (B&V) prepared a "Proposed Plan <br /> for Mitigation Activities for MCTC Stockton <br /> Agency" and presented it to a Joint meeting of <br /> DOHS , EPA, and Water Board representatives on <br /> June 19 , 1986 . This Proposed Plan was reviewed <br /> by the agencies who then returned comments on <br /> July 22 , 1986 . <br /> A revised report was prepared by B&V dated <br /> August 15 , 1986 , "Current Status and Proposed <br /> Work Plan for Mitigation Activities" . Requests <br /> for action on the Off-Site Sampling Plan, <br /> Soil Assessment Plan and Groundwater Assessment <br /> Plan are addressed in this last revision. <br />
The URL can be used to link to this page
Your browser does not support the video tag.