My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FIELD DOCUMENTS_1991
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WAGNER
>
200
>
2900 - Site Mitigation Program
>
PR0009002
>
FIELD DOCUMENTS_1991
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/17/2020 2:32:26 PM
Creation date
6/17/2020 1:35:45 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
FIELD DOCUMENTS
FileName_PostFix
1991
RECORD_ID
PR0009002
PE
2960
FACILITY_ID
FA0004040
FACILITY_NAME
SPX COOLING TECHNOLOGIES INC
STREET_NUMBER
200
Direction
N
STREET_NAME
WAGNER
STREET_TYPE
AVE
City
STOCKTON
Zip
95215
APN
14331007
CURRENT_STATUS
02
SITE_LOCATION
200 N WAGNER AVE
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
232
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
THE MARLEY COOLING TOWER COMPANY <br /> 5800 Foxridge Drive/P.O. Box 2912/Mission, Kansas 66201/Telephone: (913) 362.1818 <br /> October 2, 1991 <br /> M Jim treng <br /> D par ent o Health rvices <br /> T x ' Substance ontrol Division <br /> 10151 Croydon Way <br /> Sacramento, California 95827 <br /> RE: Progress Report for August and September, 1991 . <br /> Dear Mr. Austreng: <br /> The following is a report of the activities at the <br /> Stockton site for August and September, 1991 . <br /> A. GroundWater Monitoring. <br /> Samples were taken the week of July 22, 1991 . <br /> The results from the samples from the lysimeters <br /> is attached . The Quarterly Report on the monitor- <br /> ing wells should be available by October 18, 1991 . <br /> The next samples are scheduled to be taken the <br /> week of October 28, 1991 . <br /> i <br /> B. Remedial Activities. <br /> 1 . Subsurface Soils. <br /> 4. A Status Report was presented at the August <br /> 20, 1991 meeting. In September soil samples <br /> were taken to compare the neutron probe <br /> reading to actual soil samples to be sure the <br /> calibration is correct. This analysis should <br /> be complete and available in the near future. <br /> 2. Groundwater. <br /> Work continues on the Collection System. The <br /> new pipe line from south of the plant, has been <br /> tied into to pipe line from EW-1 to the Treat- <br /> [rY�o L i t :� xur' the <br /> °J�1 COOLING TOWER <br /> OCT1+ 1 company <br /> t ENVIRONMENTAL HEALTH <br /> PERMIT/SERVICES <br />
The URL can be used to link to this page
Your browser does not support the video tag.