Laserfiche WebLink
Brad Parsons -5- March 8, 1984 <br /> Generator Inspection - Marley Cooling Tower <br /> 2. Section 262.34(a) - Marley failed to remove hazardous waste from <br /> the facility for proper disposal within 90 days of generation <br /> of the waste. <br /> 3. Section 262.34(b) - Marley is operating an onsite hazardous waste <br /> disposal facility without a Hazardous Waste Facility Permit, and <br /> without complying with the requirements of 40 CFR, Parts 264 and <br /> 265 and the permit requirements of 40 CFR, Part 122. <br /> 4. Section 262.41 and 262.42 - Marley failed to submit annual reports <br /> as required. <br /> 5. Section 265.16 - Marley failed to provide personnel training in <br /> hazardous waste management procedures and failed to maintain <br /> documents and records of the training at the facility as required. <br /> 6. Section 265.31 - Marley failed to maintain and operate the facility <br /> in a manner to minimize the possibility of any sudden or non-sudden <br /> release of hazardous waste or hazardous waste constituents. <br /> 7. Section 265.37 265.51, 265.52,_ 265.53, 265.56 - Marley failed to <br /> have a written contingency plan as required. <br /> 8. Section 265.55 - Marley failed to designate a qualified emergency <br /> coordinator as required. <br /> VII. Discussion with Management <br /> Violations were discussed and suggestions were made for changes in the <br /> operation of the facility during the inspection. <br /> Photographs were taken. <br /> DS:st <br />