My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE HISTORY_FILE 1
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WEST
>
2801
>
2900 - Site Mitigation Program
>
PR0504943
>
SITE HISTORY_FILE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/17/2020 4:03:28 PM
Creation date
6/17/2020 3:13:16 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE HISTORY
FileName_PostFix
FILE 1
RECORD_ID
PR0504943
PE
2951
FACILITY_ID
FA0004032
FACILITY_NAME
AMERICAN MOULDING & MILLWORK (FRMR)
STREET_NUMBER
2801
STREET_NAME
WEST
STREET_TYPE
LN
City
STOCKTON
Zip
95204
APN
11709001
CURRENT_STATUS
02
SITE_LOCATION
2801 WEST LN
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
154
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SAMPLING PROTOCOL FOR ROUTINE TANK REMOVALS <br /> • I <br /> ,rhe following represent:; minimum sampling cdterion required for"ure compliance. Son samples collected shall be <br /> representative of native soils beicath the taint's invert (tattk's bottom) at a collection depth not to'exceed 2 - 4 feet. 1:1' <br /> contamination is documented daring closure,an Unauthorized Release Notification must be Completed and submitted ' <br /> within five (5) working days pursuant to California Health & Safety Code, Section 25295. ' <br /> WATER O PRESENT IN WE TANK Prr <br /> 'TANK TANK SIZE MINIMUM NUMBER LOCATION OF SOIL SAMPLES <br /> # (Gallons) of SOIL SAMPLES <br /> l .. c 1,000 1 per Tank r_ Fill OR Pump End of Ta--- <br /> 1,000 <br /> an _1,000 - 10,000 2 per Tank 1 at each End of Ya--n <br /> > 10,000 3 or More Ends and Middle OR generally <br /> per Tartk spaced along the length of the Tank <br /> PYPING AND STOCKPILE <br /> PIPING SOIL SAMPLES 1 Sample every 20 lineal feet <br /> TANK& PIPING STOCKPILE SAMPLES 2 Samples every 50 cubic yards <br /> WATTR IS PRESENT IN TANK PIT <br /> LK TANK SIZE MINIMUM NUMBER LOCATION of SOIL MINIMUM NUMBERof <br /> (Gallons) of SOIL SAMPLES SAMPLES WATER SAMPLES <br /> < 10,000 From wall next to tank <br /> Single Tank 2 ends at soil/groundwater 1 <br /> interface <br /> > 10,000 OR From wall next to tank <br /> Tank Cluster 4 ends at soil/ 1 <br /> groundwater interface <br /> SLAB PRESENT IN THE TANK PIT <br /> Soil samples shall be obtained beneath the slab within dative soils. Penetration through the obstruction will be reyuirot ii, <br /> of to collect the samples. (Physical removal of the obstruction will allow sampling according to the above wnditic),v.) <br /> "TANK TANK SIZE r MINIMUM NUMBER LOCA'T'ION of SOIL SAMPLES <br /> # (Gallons) of SOIL SAMPLES <br /> a 1,000 3 por Tank Center and Ends OR Sides of'Fink <br /> LOW - 10,000 5 prr Tattle Center and Ends OR Sides of'T'ank <br /> > 10,000 5 OR Moro per Tauk Ends and Middle and generally spacW. aloct;,, <br /> the length of the Tank . <br /> f <br /> Ll1 23 047 (Revised 7/,10/92) Pap 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.