Laserfiche WebLink
r <br /> a � <br /> San Joaquin County Public Health Service M <br /> Environmental Health Division <br /> December 15, 1995 <br /> Page 3 ti <br /> Moore, November 1, 1994). Upon approval of this proposed monitoring plan by PHS-EHD, a <br /> work plan will be submitted to PHS-EHD, which specifies monitoring well .sampling, <br /> groundwater level measurement, soil sample collection, and analytical test methods for soil and <br /> water samples. <br /> Groundwater level measurements, and original laboratory reports for groundwater samples will <br /> be presented to the PHS-EHD in annual letter reports by September of each year from 1996 to <br /> 2000. After five years of groundwater monitoring and receipt of the soil analytical data collected <br /> in July 2001, a final report will be prepared by October 2001 summarizing groundwater and <br /> soils data generated. It is expected that PHS-EHD will approve final closure of the underground <br /> tanks at that time, assuming that results from the monitoring program continue to support final <br /> closure of the underground tanks. <br /> Upon written approval of this proposed monitoring program, AFPC is prepared to immediately <br /> proceed with implementation. Please contact Kirkland and Ellis at (312) 861-2000, or the <br /> undersigned at (916) 387-8800, if you have any questions or wish to discuss this proposed <br /> monitoring program further. <br /> Sincerely, <br /> DAMES & MOORE ;l <br /> 1 <br /> Jeffrey G. Bold, Ph.D. <br /> Senior Soil Scientist <br /> SAC 180.02 <br /> i " <br />