Laserfiche WebLink
ENCLOSURE <br /> DAMES & MOORE ESTIMATED SCHEDULE FOR WORK AT THE AFPC SITE <br /> Task Completion Date <br /> Groundwater Monitoring May 1, 1995 j <br /> (Groundwater levels and water sampling) <br /> Monitoring Well Installation and Soil Borings May 15, 1995 <br /> Revised Hydrogeologic Modeling and Report July 1, :1995 <br /> -{Soil Leachability-Evaluation Report) <br /> it <br /> - - F <br /> E <br /> I <br /> SAC146.12 <br />