Laserfiche WebLink
Four additional groundwater monitoring wells are proposed to obtain data to assess the data yaps; <br /> DEW0 and DMW-1 l downs adient to the north, and DMW-12 and�� laterally to the <br /> cast and west, respectively. A detailed scope of'work for installation and sampling of these wells <br /> is presented in the following sections. <br /> 4.0 SCOPE OF WORK <br /> The proposed scope of work for the additional 1,21-DCA field investigation includes the following <br /> tasks: <br /> • Coordination with regulatory agencies to finalize this work plan, and preparation of an <br /> updated health and salety plan. <br /> • Sol] boring and installation of four new monitoring wells downgradient and laterally with <br /> respect to DMW-9. A 10-foot screened interval will be selected based on lithology of'the <br /> individual borings, but will be within the range of the approximately 45 to 70 foot bgs <br /> interval. <br /> • Sampling and analysis of the four new monitoring wells. <br /> • Preparation of a report containing the field investigation results. <br /> Details ofd these tasks and the methods to be used are presented in the following sections. <br /> 5.0 SOIL BORING AND WELL INSTALLATION <br /> Four borings will he advanced and groundwater-monitoring wells will be installed in the <br /> boreholes with total depths and screen intervals similar to DMW-9. The borings will be advanced <br /> using a hollow-stem auger (HSA)equipped drill rig. The monitoring wells will be installed in the <br /> approximate locations shown on Figure 10. All field procedures will be overseen by an on-site <br /> geologist under the direction of a California-registered geologist. The on-site geologist will be <br /> present at all tithes during drilling, .in order to: <br /> • Direct and observe the drilling subcontractor; <br /> • Maintain a lithologic log of the borehole in accordance with the United Soil Classification <br /> System (USCS); <br /> • Screen drilling cuttings and atmospheric conditions within the work place using a <br /> photo ionization detector (PID); <br /> • Oversee implementation of the Health and Safety plan. <br /> 5.1 Well Installation Permit and Utility Clearance <br /> Following the approval of this work plan, a San Joaquin County well installation permit will be <br /> obtained for the proposed monitoring wells. Site access will be coordinated with the current site <br /> operator. The well locations will be marked and Underground Service Alert (USA) will be <br /> contacted to obtain clearance of underground utilities prior to the advancement of the borings. <br /> 5.2 Drilling and Sample Collection <br /> Two 8.25-inch diameter soil borings will be drilled for the purpose of constructing 2-inch <br /> diameter groundwater monitoring wells. To reach the groundwater zone screened by DMW-9, the <br /> borings will be advanced to a depth of approximately 70 feet bgs. <br /> 6 <br />