Laserfiche WebLink
Pg 3 <br /> p �----- -- --—I p o <br /> rl 1301 <br /> r Turbine O TurbfneO TurbineO r - I <br /> I <br /> M-10 IIIIIIIII IIIIIIIII 111111111 0 111111111 111111111 <br /> Sump Su2mp Sump I FLAT METAL <br /> /ANGLEIRON <br /> Q O REQUIRED <br /> OO TO SUSPEND <br /> I I PROBE <br /> (SIDE VIEW) <br /> rrin RECEPTACLES <br /> 1 / suM+o-1 FOR FOUR <br /> SCREW-IN,PROBE <br /> CABLE PLUGS <br /> O I Tank Pad 0 0 l O <br /> TAPE/WEIGHT DOWN <br /> CABLE TO PREVENT <br /> OO 10 Feet•Min.Distance ACCIDENTAL <br /> Per NFPA 30A MOVEMENT DURING <br /> LEAK TESTING TS-STS <br /> (PROBE CABLE SUMP TEST SYSTEM <br /> PN:600.0200 SPLIT RING o 0 0 <br /> =50 FEET) <br /> POWER CORD <br /> WITH A GROUNDED <br /> SAFETY 3-PRONGED <br /> CONES ` PLUG <br /> STS-PRB-12 <br /> LEAK TESTING <br /> GROUNDED PROBE WITH: <br /> 3 PRONG <br /> TSP-SSP <br /> EXTENSION ® STAINLESS <br /> STEEL FLOAT <br /> CORD REO'D <br /> T1,1 TI <br /> SUMP TEST SYS E4 <br /> TURBINE SUMP <br /> STP WITH TEST SOLUTION <br /> (Side View) <br /> BUILDING <br /> Figure l.3 Typical Leak Detection Probe—Turbine Sump Installation Figure 1.4 Leak Detection Probe Installation <br /> Overview Turbine Sump <br /> .- — <br />