Laserfiche WebLink
UNDERGROUND STORAGE TANK <br /> SECONDARY CONTAINMENT TESTING REPORT FORM(Page 4 of s) <br /> XIII. VAPOR RECOVERY PIPING CONTAINMENT TESTING INFORMATION _ <br /> Manufacturer I Identitv Tank ID from Section III for each Manufacturer <br /> A __ BC D <br /> A B CLf I DLJ <br /> Test Method Used: ❑Manufacturer Guidelines(Specify): <br /> ❑Industry Code or Englneering Standard(Specify): <br /> U Engineered Method(specify): <br /> Attach the testing procedures and all documentation required to determine the results. #of Attached Pages <br /> Vapor Recovery Piping Containment Testing Training and Certifications(List applicable certifications.) Expiration Dote <br /> Interstitial Communication Verification Method Used: <br /> XIV. COMMENTS <br /> Provide any additional comments here. <br /> Retest after repair on diesel high flow only pressure test. <br /> XV. TURBINE/ PRODUCT PIPING SUMP TESTING INFORMATION <br /> Manufacturer IdentifyTank ID from Section III for each Manufacturer <br /> 07-03-2021 A X B El I C D <br /> A El I B C 0 1 D Ll <br /> Test Method Used: ❑x Manufacturer Guidelines(Specify): 4-Dial Gauge <br /> Nihugdii <br /> ❑ Inrhislry(:ode or Fngineering Standard (Specify): <br /> ❑Engineered Method(Specify): <br /> Attach the testing procedures and all documentation required to determine the results. #of Attached Pages <br /> Turbine i Product Piping Sump Testing Training and Certifications(List applicable certifications.) Expiration Date <br /> 8374133 07-03-2021 <br /> Icon 04-05-2021 <br /> XVI. COMMENTS <br /> Provide any additional comments here. <br /> Installed two new Icon boots on High flow diesel line. <br /> ID=Identification <br />